Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-00025
StatusFinaled
Name KOUBA HOMES
Site Address 154 E GETTYSBURG ST
Project NameNew Residence
Customer NumberDEMO BLD19-00163
ePlanReviewYes
Description
(DEMO PERMIT IS REQUIRED BEFORE THIS PERMIT CAN BE ISSUED) Permit for the construction of a new 3368 sq. ft., two story (first story 3002 sq. ft., second story 366 sq. ft.) single family dwelling with 6 bedrooms, 4 bathrooms, approximately 93 sq. ft. of covered patio/porch and a 751 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20198/1/20198/1/2019APASS
DetailsBrandon Shaw
Vince Phone #: ###-####
DOC - Permit Finaled8/1/20198/1/20198/1/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results8/1/20198/1/20198/1/2019ADONE
DetailsBrandon Shaw
ACH50- 4.4
BLD-Energy code compliance5/7/20195/7/20195/7/2019PPASS
DetailsJim Storey
Vince Phone #: ###-####
BLD-Framing/Rough-in5/1/20195/1/20195/1/2019PPASS
DetailsJim Storey
Venice Phone #: ###-#### finsh mech c/n
BLD-Wall Bracing3/12/20193/15/20193/15/2019APASS
DetailsJim Storey
Vince Phone #: ###-####
BLD-Footing2/12/20192/13/20192/13/2019APASS
DetailsJim Storey
Matt Phone #: ###-####
Issue PAID IN FULL permit  2/11/2019 DONE
Inspection Record Card- Bld  2/11/2019 DONE
Route to Impact Fee Review1/3/20191/6/20192/8/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
OVERRIDE  1/10/2019  
Meeting  1/10/2019 DONE
waiting for impact fees
Permit Ready to Issue  1/10/2019 DONE
DO NOT ISSUE THIS PERMIT WITHOUT THE DEMO PERMIT BEING APPLIED FOR AND ISSUED
Plan assigned to (RDP)1/4/20191/4/20191/9/2019 DONE
DetailsRob Patrick
1/8/19...Failed; Corrections Required.
Routing - PLAN CHECK1/9/2019 1/9/2019 FAIL
DetailsRob Patrick
Upper floor electrical plan required.
Routing - PLAN CHECK1/9/2019 1/9/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  1/9/2019 DONE
DetailsRob Patrick
Routing - PLAN CHECK1/4/2019 1/8/2019 FAIL
DetailsRob Patrick
Corrections Required
1st review completed  1/8/2019 FAIL
DetailsRob Patrick
Corrections Required
Routing - Addressing1/3/2019 1/4/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/3/2019 1/4/2019 PASS
DetailsAngela Hardy
Plan assigned to (M_H)1/3/2019 1/4/2019 DEFR
DetailsMichael Hanson
01/16 #402 L1 ePlan
Routing - MECHANICAL1/3/2019 1/4/2019 PASS
DetailsChad Schwendiman
Application received  1/3/2019 DONE
Application submitted via PDS Online on Jan 3 2019 10:24AM
Intake Approval  1/3/2019 PASS
Recd Pcfee & Taken To Pln CK  1/3/2019 DONE
Routing - PLANNING1/3/2019 1/3/2019 PASS
DetailsSue Cummings