BLD-Final | 3/18/2019 | 3/22/2019 | 3/22/2019 | A | PASS |
Brandon Shaw
|
|
|
Matt Phone #: ###-####
|
DOC - Permit Finaled | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 1/16/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
Plan assigned to (JAB) Josh | 1/8/2019 | 1/8/2019 | 1/10/2019 | | PASS |
Josh Bogle
|
|
|
1/14 remodel, ePlan - 1st done
|
Routing - PLAN CHECK | 1/10/2019 | | 1/10/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/10/2019 | | DONE |
|
|
|
Met
|
Issue PAID IN FULL permit | | | 1/10/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/10/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/8/2019 | | 1/9/2019 | | FAIL |
Josh Bogle
|
|
|
need a section view of the exterior basement walls
|
1st review completed | | | 1/9/2019 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 1/8/2019 | | FAIL |
|
|
|
Need to include a schematic of existing room, and details of wall to be built.
|
Intake Approval | | | 1/8/2019 | | FAIL |
|
|
|
Wall details need to be included in the drawings. Add the text to one of your drawings. Applicant comment is insufficient for plan review. If you are unable to add text to your drawings, you may add the wall detail information as a separate document in the documents folder
|
Intake Approval | | | 1/8/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/8/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/8/2019 | | DONE |
|
|
|
|
Application received | | | 1/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 7 2019 5:38PM
|