Permit Information
Permit NumberBLD19-00095
StatusFinaled
Name PRUSIK CONSTRUCTION
Site Address 9964 W OVERLAND RD Unit: 100
Project NameBoise Image Enhancement
Customer Number 
ePlanReviewYes
Description
(BOISE IMAGE ENHANCEMENT – SPA – EAST END OF BUILDING) (4-1-19 PLAN MODIFICATION TO MOVE THE KITCHEN SINK AND TO ADD A DISHWASHER.) This building does not have a fire sprinkler system. To construct interior improvements within an existing 2,476 square foot shell tenant space. This tenant space will be used as a Spa with treatment rooms. The wall between this tenant space and the tenant space on the West was constructed under permit BLD18-02673. Work is to include a concrete slab on grade, interior nonbearing walls, two single-user toilet rooms accessible to the disabled, interior doors, arched doorways without doors, suspended acoustical ceilings, gypsum board ceilings, millwork, and finishes. No one within this tenant space is allowed to be incapable of self-preservation. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/20/20197/16/2019 DONE
This permit finaled on the web by Michael McHargue
First Notice 6/9/20197/10/2019 DONE
mailed 7-11
Permanent Occupancy  5/30/2019 DONE
BLD-Final5/28/20195/28/20195/28/2019APASS
DetailsMike Jordan
All issues resolved. ok for perm occ.
BLD-Final5/22/20195/22/20195/22/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Adam Joslin. Install remainder of carper and transitions. install base in restrooms. Mirror and sink mounted to high for ADA. remove exit sign in hall way.
FIRE-Final Inspection5/21/20195/21/20195/21/2019PPASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by Michael McHargue
FIRE-Final Inspection5/20/20195/21/20195/21/2019PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Adam Joslin Inspection cancelled from web by: Michael McHargue
BLD-Ceiling Grid Inspection5/9/20195/9/20195/9/2019PPASS
DetailsMike Jordan
BLD-Ceiling Grid Inspection5/7/20195/8/20195/8/2019ANR
DetailsMike Jordan
early morning preference Phone #: ###-#### Inspection requested via web by Adam Joslin. Needs lelctrical and mech inspections first.
Print Occupancy Form  4/2/2019 DONE
CHANGE STATUS TO (ISS)  4/2/2019 DONE
Plan assigned to (CJW)3/13/20193/13/20194/1/2019 PASS
DetailsCarl Westfall
Plan mod - Boise Image Enhancement - (routed to staff)
Plan Reviewer's activity  4/1/2019 PASS
The 1st plan mod was reviewed and approved. It could have been issued on 3-25-19 but wasn't because the Plans Examiner was on vacation. The issuance was delayed for a week until he got back on 4-1-19. Instructions were left to issue this permit when the review was completed but for some reason it wasn't.
Permit Ready to Issue  4/1/2019 DONE
Plan Mod Approved (fees due)
BLD-Energy code compliance3/26/20193/27/20193/27/2019APASS
DetailsMike Jordan
ADam Phone #: ###-####
BLD-Wall cover3/25/20193/26/20193/26/2019ACANC
DetailsMike Jordan
Adam- wall cover -in Review status due to plan mod- adding appliances to kitchen Phone #: ###-####
BLD-Framing/Rough-in3/26/20193/26/20193/26/2019APASS
DetailsMike Jordan
Adam- wall cover -in Review status due to plan mod- adding appliances to kitchen Phone #: ###-####
Routing - PLUMBING3/21/2019 3/25/2019 PASS
DetailsDaryl Spivey
1) Install tempering device on lavs as required ISPC 407.3
BLD-Wall cover3/21/20193/22/20193/22/2019PNR
DetailsMike Jordan
Permit had been issued but in Review status for Plan mod for adding kitchen appliances - please call Permit desk for any questions. Please call Adam for access Phone #: ###-####. Neeeds to complete airseal pack first.
Routing - PLAN CHECK3/22/2019 3/22/2019 PASS
DetailsCarl Westfall
Plan mod approved
Routing PW Sewer Rating3/21/2019 3/22/2019 PASS
DetailsAngela Hardy
$336
Plan resubmittals received  3/20/2019 DONE
Route to Impact Fee Review3/13/20193/16/20193/15/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan Reviewer's activity  3/14/2019 FAIL
The 1st plan mod plan intake failed because it was not compliant with accessibility issues. Called the Architect and explained the problem. Put a red line note on the drawings. Sent the workflow back to the applicant.
Plan resubmittals requested  3/14/2019 DONE
Plan Modification Accepted  3/13/2019 DONE
plan mod accepted in e plan-changing the kitchen sink & addition of a dishwasher- sheets A-1.1, P-1, P-2, E-1 & E-3-assigned to CJW
Routing - PLAN CHECK3/20/2019 2/21/2019 PASS
DetailsCarl Westfall
1st plan mod approved
CHANGE ISSUED DATE  2/19/2019 DONE
permit was issued twice by mistake, corrected to original issued date.
Print Occupancy Form  2/19/2019 DONE
Issue PAID IN FULL permit  2/19/2019 DONE
Meeting  2/13/2019 DONE
sent email to Adam Joslin informing him the rce number provided does not match the GC name on the revised value form
Routing - FIRE1/22/20191/22/20192/12/2019 PASS
DetailsMark Scharfen
IFC fire 02.12.2019.pdf. Complete.
Plan assigned to (CJW)1/22/20191/22/20192/12/2019 PASS
DetailsCarl Westfall
(1st done) 02/07/19 (L3 - 15 days) (ePlan - 13 sheets) Boise Image Enhancement (L-3)
1st review completed  2/12/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/12/2019 DONE
Permit Ready to Issue  2/12/2019 DONE
NEED adam@prusikbuilt.com
met-ACHD

MET
REVISED VALUE
GC FORM
Routing - PLAN CHECK1/22/2019 2/11/2019 PASS
DetailsCarl Westfall
Routing - MECHANICAL1/22/2019 1/25/2019 PASS
DetailsTroy James
Routing - PLANNING1/22/2019 1/25/2019 PASS
DetailsDavid Moser
use allowed as per CUP08-00045 and CAR08-00009
Routing PW Solid Waste1/22/2019 1/24/2019 PASS
DetailsEvan Carpenter
Routing PW Environmental1/22/2019 1/23/2019 PASS
DetailsRick Christenson
Routing - PLUMBING1/22/2019 1/23/2019 PASS
DetailsDaryl Spivey
1) Install tempering device as required by ISPC 407.3 on lavs.
Routing - Addressing1/22/2019 1/22/2019 PASS
DetailsDoug Chausow
Ste 100
Routing - PUBLIC WORKS1/22/2019 1/22/2019 PASS
DetailsAngela Hardy
Intake Approval  1/18/2019 PASS
Application received  1/8/2019 DONE
Application submitted via PDS Online on Jan 8 2019 3:55PM