BLD-Final | 9/16/2019 | 9/18/2019 | 9/18/2019 | A | DONE |
Jim Storey
|
|
|
Derek Phone #: ###-####
|
DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 9/13/2019 | 9/17/2019 | 9/17/2019 | P | NR |
Jim Storey
|
|
|
please call on way // Derek Phone #: ###-#### need co2 and sd
|
Issue PAID IN FULL permit | | | 2/27/2019 | | DONE |
|
|
|
emailed dchomes1@yahoo.com to sign permit
|
Inspection Record Card- Bld | | | 2/27/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 2/4/2019 | 2/4/2019 | 2/26/2019 | | DONE |
Brian McGowan
|
|
|
1st review complete - Remodel from Josh's List - Corrections required.
|
Plan Reviewer's activity | | | 2/26/2019 | | DONE |
Brian McGowan
|
|
|
The area the bathroom is being added to was presumably under BLD00-01208. In the scope of work it mentions verifying smoke and carbon monoxide alarms. In the new square footage it adds 480 square feet which is approx. the same amount that the bathroom is to be added into. There were no plans with permit BLD00-01208 for the living space addition that I could find.
|
Routing - PLAN CHECK | 2/26/2019 | | 2/26/2019 | | PASS |
Brian McGowan
|
|
|
ESC - NO ENERGY - NO
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/26/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 2/4/2019 | | 2/4/2019 | | FAIL |
Brian McGowan
|
|
|
The area the proposed Bathroom is to be added does not seem to have been within a permited addition. It appears to have been added under an existing patio cover. I've requested the drawings or a permit number from that addition be provided if possible.
|
Routing - PLAN CHECK | 1/23/2019 | | 1/23/2019 | | FAIL |
Josh Bogle
|
|
|
plans lack required information
|
Routing - PLAN CHECK | 1/17/2019 | | 1/18/2019 | | FAIL |
Josh Bogle
|
|
|
submittal lacked full floor plans
|
1st review completed | | | 1/18/2019 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 1/17/2019 | 1/17/2019 | 1/17/2019 | | DEFR |
Josh Bogle
|
|
|
1/23 remodel, ePlan - 1st done
|
Intake Approval | | | 1/17/2019 | | PASS |
|
|
|
|
Application received | | | 1/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 10 2019 11:02AM
|