BLD-Framing/Rough-in | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Dave Hannah
|
|
|
Requesting framing/rough in as well as ok to cover. Please call at least 15 min in advance of arrival to ensure access if possible. Phone #: ###-#### Inspection requested via web by Adam Eickmeier ok to cover insulation ok
|
Routing - MECHANICAL | 3/20/2019 | | 3/20/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
Routing Walk-In (BLD) | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 3/11/2019 | 3/11/2019 | 3/11/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/11/2019 | | 3/11/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/11/2019 | | DONE |
Josh Bogle
|
|
|
|
Plan Modification Accepted | | | 3/11/2019 | | DONE |
|
|
|
not putting in walls
|
Permit Ready to Issue | | | 3/11/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 3/11/2019 | | |
|
|
|
|
Routing - MECHANICAL | 3/6/2019 | | 3/6/2019 | | PASS |
Troy James
|
|
|
Manual j report
|
Issue PAID IN FULL permit | | | 1/29/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | DONE |
Josh Bogle
|
|
|
|
Meeting | | | 1/10/2019 | | DONE |
|
|
|
Adam is buying the house tomorrow 1/11/19. Informed him we will need proof that he is buying the house. (warranty deed)
|
Routing - PLAN CHECK | 1/10/2019 | | 1/10/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 1/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/10/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/10/2019 | | DONE |
|
|
|
need warranty deed with Adam and seller's signature
|
Application received | | 1/10/2019 | | | |
|
|
|
|