Permit Information
Permit NumberBLD19-00132
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2550 E WARM SPRINGS AVE
Project NameWinslow A-SS
Customer NumberGATE CITY / DO NOT REISSUE
ePlanReviewYes
Description
WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 1950 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 180 sq. ft. of covered patio/porch and a 762 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. REScheck has been submitted. Engineering has been provided. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions. NO SPRINKLERS REQUIRED. LGM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/30/201912/31/201912/31/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled12/31/201912/31/201912/31/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results12/30/201912/31/201912/31/2019ADONE
DetailsBrandon Shaw
ACH50- 4.7
BLD-Energy code compliance10/17/201910/23/201910/23/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in10/17/201910/21/201910/21/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other9/30/20199/30/20199/30/2019PPASS
DetailsBrandon Shaw
Soffit...
BLD-Wall Bracing9/30/20199/30/20199/30/2019PPASS
DetailsBrandon Shaw
Jose Phone #: ###-####
BLD-Foundation7/23/20197/23/20197/23/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing7/18/20197/19/20197/19/2019APART
DetailsMike Jordan
Victor Phone #: ###-####
BLD-Footing7/17/20197/18/20197/18/2019ACANC
DetailsBrandon Shaw
Victor Phone #: ###-####
PubWorks Subgrade Approval7/18/20197/18/20197/18/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
CHANGE STATUS TO (ISS)  7/17/2019 DONE
permit should be in issued status
OVERRIDE  1/30/2019  
Plan assigned to (BJM)1/30/20191/30/20191/30/2019 DONE
DetailsBrian McGowan
Needs FIRE Review
Routing - FIRE1/29/20191/29/20191/30/2019 PASS
DetailsLee G Meredith
No sprinklers required.
(F) Reprint permit  1/30/2019 DONE
OVERRIDE  1/29/2019  
Issue PAID IN FULL permit  1/29/2019 DONE
Issued by mistake - pending fire review
Inspection Record Card- Bld  1/29/2019 DONE
CHANGE STATUS TO (REV)  1/29/2019 DONE
Gate City Fire review missed.
Permit Ready to Issue  1/29/2019 DONE
Plan assigned to (BJM)1/14/20191/14/20191/28/2019 DONE
DetailsBrian McGowan
01/25 sfd ePlan L1- Need mechanical review
PLANS/APPL TAKEN TO FRONT DESK  1/28/2019 DONE
DetailsBrian McGowan
1st review completed  1/25/2019 DONE
DetailsBrian McGowan
Routing - PLAN CHECK1/14/2019 1/16/2019 PASS
DetailsBrian McGowan
Routing - MECHANICAL1/14/2019 1/16/2019 PASS
DetailsTroy James
Route to Impact Fee Review1/14/20191/17/20191/15/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - PLANNING1/14/2019 1/14/2019 PASS
DetailsColleen T Carroll
Routing - Addressing1/14/2019 1/14/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/14/2019 1/14/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  1/14/2019 DONE
Intake Approval  1/14/2019 PASS
Recd Pcfee & Taken To Pln CK  1/14/2019 DONE
Application received  1/11/2019 DONE
Application submitted via PDS Online on Jan 11 2019 10:13AM