BLD-Conference | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Tell Riley
|
|
|
Requesting final inspection for building permit. Scheduling final electrical inspection on same day. Phone #: ###-#### Inspection requested via web by Lee Long//final complete//
|
DOC - Permit Finaled | 6/26/2019 | 6/26/2019 | 6/26/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 1/18/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Jim Sly
|
|
|
Furring out basement. Elec rough-in inspection will be same day, a.m. Phone #: ###-#### Inspection requested via web by Lee Long
|
Plan Reviewer's activity | | | 1/14/2019 | | DONE |
Brian McGowan
|
|
|
Rita submitted two RESchecks showing the walls could be R-16. The walls would not pass by .4% at R15- I agreed that the minimal difference was not enough to warrant meeting the prescriptive value of R-19. (See uploaded RESchecks)
|
(F) Reprint permit | | | 1/14/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/14/2019 | | DONE |
|
|
|
|
Telephone call | | | 1/14/2019 | | DONE |
|
|
|
Emailed Rita the revised sign off card and building permit
|
Inspection Record Card- Bld | | | 1/14/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 1/11/2019 | 1/11/2019 | 1/11/2019 | A | DONE |
Rob Patrick
|
|
|
|
Plan assigned to (RDP) | 1/11/2019 | 1/11/2019 | 1/11/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/11/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/11/2019 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 1/11/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/11/2019 | | 1/11/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 1/11/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 1/11/2019 | | DONE |
Rob Patrick
|
|
|
|
Application received | | 1/11/2019 | | | |
|
|
|
|