Print Statement | | | 3/9/2020 | | DONE |
|
|
|
|
Third Notice | | 1/4/2020 | 2/6/2020 | | DONE |
|
|
|
mailed 2-7-20
|
Second Notice | | 12/6/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
First Notice | | 11/17/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
Permanent Occupancy | | | 11/7/2019 | | DONE |
|
|
|
|
Zoning Approval | 11/6/2019 | 11/6/2019 | 11/6/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Tell Riley
|
|
|
Emanuel Phone #: ###-####//final complete per plans//transition added at bathroom door//
|
Temporary Occupancy | 10/17/2019 | 1/15/2020 | 10/17/2019 | | DONE |
Brittany Hill
|
|
|
|
Print Occupancy Form | | | 10/17/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Emanuel Phone #: ###-####
|
BLD-Final | 10/10/2019 | 10/14/2019 | 10/14/2019 | P | PART |
Tell Riley
|
|
|
Emmanual Phone #: ###-####//temp ok to move equipment in//no card onsite//need verification of accessible restroom from architect-dimensions on plans do not reflect actual//transition is too tall at restroom door//call for final when resolved//
|
FIRE-Final Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given until the exit discharge light has been installed at the main exit as discussed. Emanuel Phone #: ###-####
|
FIRE-Final Inspection | 10/10/2019 | 10/14/2019 | 10/14/2019 | A | FAIL |
Troy Cobbley
|
|
|
I called contact twice and then went to project site and found no one and the business is locked. No inspection performed. Emmanual Phone #: ###-####
|
BLD-Final | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | CANC |
Tell Riley
|
|
|
Emanuel Phone #: ###-####//will reschedule for monday//
|
FIRE-Final Inspection | 10/8/2019 | 10/9/2019 | 10/9/2019 | A | CANC |
Troy Cobbley
|
|
|
Wasx supposed to be scheduled for monday per contact
Emanuel Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/8/2019 | | DONE |
|
|
|
|
Zoning Approval Temp | 10/7/2019 | 10/7/2019 | 10/7/2019 | | DONE |
Katelyn Menuge
|
|
|
Bonded for Landscape Planter Islands
|
Plan assigned to (BJM) | 7/30/2019 | 7/30/2019 | 8/21/2019 | | DONE |
Brian McGowan
|
|
|
08/19- plan mod- location of paint booth- Prescreen accepted 8-1
|
Permit Ready to Issue | | | 8/21/2019 | | DONE |
|
|
|
plan mod so please do not re issue
|
Routing - FIRE | 8/2/2019 | 8/2/2019 | 8/19/2019 | | PASS |
Mark Scharfen
|
|
|
08/20-Auto Express plan mod review complete 08.19.2019. Uploaded rev_fire 08.19.2019.pdf. Complete.
|
Routing - PLAN CHECK | 8/2/2019 | | 8/6/2019 | | PASS |
Brian McGowan
|
|
|
|
CHANGE STATUS TO (REV) | | | 7/30/2019 | | DONE |
|
|
|
plan mod assigning reviewer did not change the status
|
Plan Modification Accepted | | | 7/30/2019 | | DONE |
|
|
|
plan mod - location of paint booth
|
BLD-Conference | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | DONE |
Tell Riley
|
|
|
Emaunal Phone #: ###-####//submit plan change for distance from west wall on paint booth//wall is CMU//
|
FIRE-Conference | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | DONE |
Troy Cobbley
|
|
|
We spoke about getting building inspector approval for rated walls since they can not meet the min. 3'-0" clearance rule and we spoke about class 1 wiring near openings.
Emanual Phone #: ###-####
|
Print Occupancy Form | | | 5/23/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/23/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 1/16/2019 | 1/16/2019 | 5/22/2019 | | DONE |
Brian McGowan
|
|
|
05/22 - 4th review complete 02/13 Auto Express (L-3) 20 days - Corrections Required- 3rd review
|
Routing - PLAN CHECK | 5/16/2019 | | 5/22/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/22/2019 | | DONE |
|
|
|
MET EMANUELMANGEAC@GEMSTATECONTRACTORSINC.COM
Need GC and Revised Value
|
Plan Reviewer's activity | | | 5/21/2019 | | DONE |
Brian McGowan
|
|
|
Sent to DR for final additional review after FIRE review and requirements.
|
Routing - Design Review | 5/21/2019 | | 5/21/2019 | | PASS |
KayCee Babb
|
|
|
Per DRH18-00583. Designs approved were not altered, in respect to Design Review, since 1-17-19 sign off. Project shall comply with all conditions of approval, including landscape terminal plantings.
|
Routing - FIRE | 5/16/2019 | 5/16/2019 | 5/20/2019 | | PASS |
Mark Scharfen
|
|
|
05.20.2019-passed ifc review. Uploaded rev_fire 05.20.2019.pdf.
|
Routing - MECHANICAL | 5/20/2019 | | 5/20/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 5/14/2019 | | 5/16/2019 | | FAIL |
Brian McGowan
|
|
|
Not all corrections were resolved.
|
Routing - FIRE | 5/14/2019 | 5/14/2019 | 5/15/2019 | | FAIL |
Mark Scharfen
|
|
|
05.15.2019-Finished fire reivew. Uploaded rev_fire 05.15.2019.pdf and emailed architect.
|
Routing - PLAN CHECK | 5/13/2019 | | 5/13/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 5/7/2019 | 5/7/2019 | 5/8/2019 | | FAIL |
Mark Scharfen
|
|
|
Reviewed resubmital. Uploaded REV_fire 05.08.2019.pdf and emailed to architect.
|
Routing - PLAN CHECK | 4/10/2019 | | 4/18/2019 | | FAIL |
Brian McGowan
|
|
|
See FIRE
|
Routing - FIRE | 4/10/2019 | 4/10/2019 | 4/15/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 3rd review 04.15.2019.pdf uploaded and emailed to architecht.
|
Routing - FIRE | 3/6/2019 | 3/6/2019 | 3/7/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 2nd review 03.07.2019.pdf uploaded and emailed to architecht.
|
Routing - PLAN CHECK | 2/21/2019 | | 2/21/2019 | | PASS |
Brian McGowan
|
|
|
|
Plan Reviewer's activity | | | 2/20/2019 | | DONE |
Brian McGowan
|
|
|
Emailed Jeff asking for the information on the Garage doors rather than fail it and wait for FIRE to finish their review.
|
Route to Impact Fee Review | 2/15/2019 | 2/18/2019 | 2/15/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/15/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/16/2019 | | 2/15/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - FIRE | 1/16/2019 | 1/16/2019 | 2/8/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st review 02.08.2019. Emailed architect.
|
Routing PW Environmental | 1/17/2019 | | 1/23/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - Addressing | 1/16/2019 | | 1/17/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/16/2019 | | 1/17/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 1/16/2019 | | 1/17/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00583
|
Intake Approval | | | 1/14/2019 | | PASS |
|
|
|
|
Application received | | | 1/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 11 2019 2:12PM
|
Intake Approval | | | 1/11/2019 | | FAIL |
Michael Hanson
|
|
|
#304 form needs to be signed and dated
|