Third Notice | | 8/10/2019 | 8/27/2019 | | DONE |
|
|
|
This permit finaled on the web by Todd Kurns
|
Second Notice | | 7/20/2019 | 8/5/2019 | | DONE |
|
|
|
mailed 8-5-19
|
First Notice | | 6/30/2019 | 7/10/2019 | | DONE |
|
|
|
MAILED 7-11
|
Permanent Occupancy | | | 6/20/2019 | | DONE |
|
|
|
|
BLD-Final | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Mike Jordan
|
|
|
Thx. Todd Phone #: ###-#### Inspection requested via web by Todd Kurns. Ok for perm occ.
|
FIRE-Final Inspection | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Thx. Todd Phone #: ###-#### Inspection requested via web by Todd Kurns
|
FIRE-Final Inspection | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | CANC |
Troy Cobbley
|
|
|
Will be ok to final life safety when the project related fire alrm permit has been finaled.
Troy,
Call me when you get a moment before you head over to the space.
Thanks,
Todd Phone #: ###-#### Inspection requested via web by Todd Kurns
|
BLD-Final | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | NR |
Mike Jordan
|
|
|
Mike,
Call me when you get a moment before you head over to the space.
Thanks,
Todd Phone #: ###-#### Inspection requested via web by Todd Kurns.
|
BLD-Final | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | NR |
Mike Jordan
|
|
|
Mike,
Troy is also scheduled for inspection on fire. Call me. Code to lockbox 8601 Phone #: ###-#### Inspection requested via web by Todd Kurns
|
FIRE-Final Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need sprinkler modifications, need sticker at exit door, need the fire alarm system tested/approved as discussed
Troy,
Call me there is a lockbox code is 8601 Phone #: ###-#### Inspection requested via web by Todd Kurns
|
CHANGE STATUS TO (ISS) | | | 3/8/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/20/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Mike Jordan
|
|
|
Mike,
Call me when headed that way. Thx. Todd Phone #: ###-#### Inspection requested via web by Todd Kurns. Interior steel stud framed walls ok.
|
Permit Ready to Issue | | | 2/7/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/7/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/7/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 1/22/2019 | 1/22/2019 | 2/1/2019 | | DONE |
Brian McGowan
|
|
|
01/25 L1 Continued Care LTC ePlan - 1str review complete - corrections required
|
Routing - Design Review | 2/1/2019 | | 2/1/2019 | | PASS |
Katelyn Menuge
|
|
|
Replacing exterior door with a door hinged on the opposite side to meet accessibility requirements
|
Routing - PLAN CHECK | 2/1/2019 | | 2/1/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/1/2019 | | DONE |
|
|
|
MET tkurns23@gmail.com
GC
Rev cert of val
|
Route to Impact Fee Review | 1/30/2019 | 2/2/2019 | 1/31/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 1/22/2019 | | 1/30/2019 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 1/30/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - Addressing | 1/22/2019 | | 1/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/22/2019 | | 1/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 1/18/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 1/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 11 2019 2:22PM
|