(M.H. & ASSOCIATES, LLC DBA ALLSTATE INSURANCE) This building is fully fire sprinkled. Permit to demo existing non-load bearing interior wall with door to create larger work area, modifying existing bathroom to create an ADA compliant bathroom, new break room sink and cabinetry, new paint and floor finishes. This space is 1,492 sqft. and was previously occupied by Electrolux under permit BLD05-03041. Approval is contingent on adhering to approved plans. Interior finishes in compliance with Ch. 8 of the 2015 IBC. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 4/28/20194/23/2019 DONE
This permit finaled on the web by Todd Kurns
Permanent Occupancy  4/18/2019 DONE
BLD-Final3/25/20193/25/20193/25/2019PPASS
DetailsMike Jordan
Mike,

Lockbox code is 9701. I scheduled Troy today also for fire. Phone #: ###-#### Inspection requested via web by Todd Kurns. OK for perm occ.
FIRE-Final Inspection3/25/20193/25/20193/25/2019PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in2/28/20193/1/20193/1/2019APASS
DetailsMike Jordan
Mike,
If no one is there. The lockbox code to the left of the door is 9701. Thx. Todd. Phone #: ###-#### Inspection requested via web by Todd Kurns. Interior steel stud framed walls ok.
Print Occupancy Form  2/20/2019 DONE
Issue PAID IN FULL permit  2/11/2019 DONE
Inspection Record Card- Bld  2/11/2019 DONE
Route to Impact Fee Review1/30/20192/2/20191/31/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit

No impact fees assessed as no new square footage and use is stepping down from (commercial) retail to office space. SLC
Plan assigned to (M_H)1/22/2019 1/31/2019 DONE
DetailsMichael Hanson
01/30 #518 L2 ePlan. 1st review completed - See changemark in ePlan for corrections required. MDH
Routing - PLAN CHECK1/31/2019 1/31/2019 PASS
DetailsMichael Hanson
Case Summary (BLD)  1/31/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  1/31/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/31/2019 DONE
Need
MET - GC
MET - Rev cert of val
Routing - PLAN CHECK1/22/2019 1/30/2019 FAIL
DetailsMichael Hanson
See corrections required in ePlan.
1st review completed  1/30/2019 FAIL
DetailsMichael Hanson
Routing - Addressing1/22/2019 1/22/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/22/2019 1/22/2019 PASS
DetailsAngela Hardy
Intake Approval  1/17/2019 PASS
Application received  1/14/2019 DONE
Application submitted via PDS Online on Jan 14 2019 5:26AM