BLD-Final | 7/19/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
DOC - Permit Finaled | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Energy code compliance | 5/8/2019 | 5/8/2019 | 5/8/2019 | A | PASS |
Jim Storey
|
|
|
Corey Phone #: ###-####
|
BLD-Framing/Rough-in | 5/6/2019 | 5/6/2019 | 5/6/2019 | P | PART |
Jim Storey
|
|
|
Cory Phone #: ###-#### Please go as late as possible, thank you c/n fire rated const. and openings need verifacation covered without insp./ 25/450 verrifacation white vappor barrior/4x8 header spec. at window at stairwell. ok to insulate.
|
BLD-Wall Bracing | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Jim Storey
|
|
|
shear // Corey Phone #: ###-####
|
BLD-Foundation | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 3/12/2019 | 3/12/2019 | 3/12/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Set backs per plot plan...
|
BLD-Footing | 3/7/2019 | 3/8/2019 | 3/8/2019 | A | FAIL |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron min 24 inches frost depth. do not place
|
Issue PAID IN FULL permit | | | 2/19/2019 | | DONE |
|
|
|
emailed kkolnes@yahoo.com to sign the building permit and erosion permit
|
Inspection Record Card- Bld | | | 2/19/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/15/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 1/18/2019 | 1/18/2019 | 2/15/2019 | | DONE |
Brian McGowan
|
|
|
01/30 sfd L1 ePlan - 1st review complete - 2nd Corrections required
|
Routing - PLAN CHECK | 2/15/2019 | | 2/15/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/15/2019 | | DONE |
|
|
|
met
|
Routing - PLANNING | 2/4/2019 | | 2/4/2019 | | PASS |
Katelyn Menuge
|
|
|
|
1st review completed | | | 1/30/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/18/2019 | | 1/30/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 1/18/2019 | | 1/23/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 1/18/2019 | 1/21/2019 | 1/22/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 1/18/2019 | | 1/18/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLANNING | 1/18/2019 | | 1/18/2019 | | FAIL |
Katelyn Menuge
|
|
|
Structure height is required to be measured from grade.
|
Routing - PUBLIC WORKS | 1/18/2019 | | 1/18/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 1/18/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/18/2019 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/17/2019 | | FAIL |
|
|
|
Upload elevations for the home. Garage elevations were uploaded twice.
|
Application received | | | 1/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 14 2019 12:32PM
|
Intake Approval | | | 1/14/2019 | | FAIL |
|
|
|
Each sheet needs to be uploaded individually. We will remove the multiple loaded pages.Define exterior materials. Indicate crawlspace and attic access. Manual J required.
|