Second Notice | | 5/16/2019 | 5/8/2019 | | DONE |
|
|
|
This permit finaled on the web by Tyson Jardine
|
First Notice | | 4/29/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
Permanent Occupancy | | | 4/19/2019 | | DONE |
|
|
|
|
BLD-Final | 4/17/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Tyson Jardine OK for Perm Occ.
|
FIRE-Final Inspection | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire exitnguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Tyson Jardine
|
FIRE-Final Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | CANC |
Jim Page
|
|
|
Informed point of contact that the FIR permit for fire sprinkler is still in issued status, need FIR permit to be finaled before life fire safety inspection, this request is cancelled per telephone conversation with POC.
Phone #: ###-#### Inspection requested via web by Tyson Jardine
|
BLD-Framing/Rough-in | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Jim Sly
|
|
|
Call 30 min before for access. Phone #: ###-#### Inspection requested via web by Tyson Jardine
|
Issue PAID IN FULL permit | | | 2/19/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/19/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 1/28/2019 | 1/28/2019 | 2/5/2019 | | PASS |
Joe Bruce
|
|
|
02/06 (L2) Boise Juice Company ePlan
|
Routing - PLAN CHECK | 1/28/2019 | | 2/5/2019 | | PASS |
Joe Bruce
|
|
|
|
1st review completed | | | 2/5/2019 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/5/2019 | | DONE |
|
|
|
need GC
need revised value
|
Routing - MECHANICAL | 1/28/2019 | | 2/1/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing PW Environmental | 1/29/2019 | | 1/31/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 1/28/2019 | | 1/29/2019 | | PASS |
Daryl Spivey
|
|
|
Provide RPBP on water to E-7A hose reel line.
|
Routing - PUBLIC WORKS | 1/28/2019 | | 1/29/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 1/28/2019 | | 1/28/2019 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 1/24/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 1/18/2019 | | FAIL |
Joe Bruce
|
|
|
1) Provide values for all mechanical, plumbing, and electrical work on a separate certificate of value uploaded into the documents folder. No values were listed in your application, but work is shown on the plans for these trades.
2) Plan sheets (G1-2) does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheets with a blank 4” x 2” (4"x4" on cover) space located 3” off the right sheet edge to allow for the title block. Verify ALL plan sheets have the required space for city approval stamp. See ePlan submittal standards at this link: https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
3) COMcheck lighting compliance form is missing the signature by lighting designer.
4) The incorrect building codes for the City of Boise have been listed on the cover sheet. Revise to currently adopted codes. See this link for codes: https://pds.cityofboise.org/media/1951/currently-adopted-building-codes-12-27-17.pdf
5) Sheet A1.1 shows the replacement of an exterior door. All exterior changes are required to have prior planning and zoning approval prior to submittal for building permit. Please contact KayCee Babb at ###-#### regarding the application requirements.
|
Application received | | | 1/15/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 15 2019 7:59AM
|