Permit Information
Permit NumberBLD19-00168
StatusFinaled
Name DAUBY CONSTRUCTION MGMT
Site Address 1111 W JEFFERSON ST Unit: 75
Project NameBoise Cascade - Suite #75
Customer NumberEPLAN BLD19-00141
ePlanReviewYes
Description
**(BOISE CASCADE – LOWER FLOOR - SUITE #75)** (2 PERMITS FILED UNDER BLD19-00141 IN EPLANREVIEW) NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit is to remodel an existing vacant 9,403 sq. ft. tenant space by dividing it into two separate tenant spaces, this tenant space is to be 1,601 sq. ft. and the remaining 7,802 sq. ft. will be used for expanding an existing occupied tenant space created under BLD19-00141. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing wall, construction of tenant demising wall, select new door/door frame suspended acoustic ceiling, light fixtures, electrical work mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/20/20198/1/2019 DONE
This permit finaled on the web by Justin Dauby
First Notice 6/20/20197/10/2019 DONE
mailed 7-11
Permanent Occupancy  6/10/2019 DONE
BLD-Final5/7/20195/9/20195/9/2019PPASS
DetailsTony Young
Eric Phone #: ###-####
FIRE-Final Inspection5/8/20195/9/20195/9/2019APASS
DetailsTroy Cobbley
Life safety passed. Provide suite number prior to a building inspection.

Eric Phone #: ###-####
FIRE-Final Inspection5/7/20195/8/20195/8/2019AFAIL
DetailsTroy Cobbley
Need to provide the fire extinguisher as discussed and provide inspection for the project related fire alarm permit. Eric Phone #: ###-####
BLD-Wall cover4/25/20194/25/20194/25/2019PPART
DetailsTony Young
Eric Phone #: ###-####,, ceiling grid ok
BLD-Framing/Rough-in3/14/20193/15/20193/15/2019APASS
DetailsDave Hannah
Eric Phone #: ###-####
Print Occupancy Form  2/5/2019 DONE
Issue PAID IN FULL permit  2/5/2019 DONE
Permit Ready to Issue  2/4/2019 DONE
all met
GC Form
Revised Value
(DO NOT ISSUE WITHOUTH BLD19-00141)
Plan assigned to (JG)1/16/20191/16/20191/31/2019 PASS
DetailsJavier Guzman
1st rev comp, 1/18 L1 Vanilla ePlan
Routing - PLAN CHECK1/30/2019 1/31/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  1/31/2019 DONE
Route to Impact Fee Review1/18/20191/21/20191/22/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK1/16/2019 1/18/2019 FAIL
DetailsJavier Guzman
1st review completed  1/18/2019 FAIL
DetailsJavier Guzman
Intake Approval  1/16/2019 PASS
DetailsJavier Guzman
Routing - Addressing1/16/2019 1/16/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/16/2019 1/16/2019 PASS
DetailsAngela Hardy
Application received 1/16/2019   
Application received 1/16/2019   
Application received 1/16/2019