BLD-Final | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | CANC |
Tell Riley
|
|
|
final was complete on 6/10/19//needed doc final//
|
DOC - Permit Finaled | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 | | DONE |
Tell Riley
|
|
|
final was complete on 6/10/19//needs doc final//
|
BLD-Final | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Tell Riley
|
|
|
Cody Phone #: ###-####, final complete
|
BLD-Energy code compliance | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Jim Sly
|
|
|
Cody Phone #: ###-####
|
BLD-Framing/Rough-in | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Jim Sly
|
|
|
Cody Phone #: ###-####
|
BLD-Wall Bracing | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | PASS |
Jim Sly
|
|
|
shear // Cody Phone #: ###-####
|
Routing Walk-In (BLD) | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/17/2019 | | 1/17/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 1/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/17/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/17/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 1/16/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 1/16/2019 | 1/16/2019 | 1/16/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/16/2019 | | 1/16/2019 | | FAIL |
Josh Bogle
|
|
|
lacked multiple construction details
|
1st review completed | | | 1/16/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 1/16/2019 | | | |
|
|
|
|