BLD-Aging Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 | | DONE |
Tell Riley
|
|
|
Expires: 01/23/20
|
Change Expiration Date Only | | | 2/13/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/12/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 1/28/2019 | 1/28/2019 | 2/11/2019 | | PASS |
Josh Bogle
|
|
|
2/1 PV mod, ePlan -1st done
|
Routing - PLAN CHECK | 2/11/2019 | | 2/11/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 2/11/2019 | | DONE |
|
|
|
plan mod do not re issue
|
Routing - PLAN CHECK | 2/8/2019 | | 2/8/2019 | | FAIL |
Josh Bogle
|
|
|
fire access pathways not shown
|
Routing - PLAN CHECK | 1/28/2019 | | 1/29/2019 | | FAIL |
Josh Bogle
|
|
|
no info on tilt racking
|
Routing - PLAN CHECK | 1/29/2019 | | 1/29/2019 | | FAIL |
Josh Bogle
|
|
|
called Kelsey - more info needed on tilt racking
|
Plan Modification Accepted | | | 1/28/2019 | | DONE |
|
|
|
Added a tilt to 4 of the panels b/c the roof is flat.
|
Plan assigned to (JAB) Josh | 1/16/2019 | 1/16/2019 | 1/23/2019 | | PASS |
Josh Bogle
|
|
|
1/22 PV, ePlan - 1st done
|
Routing - PLAN CHECK | 1/23/2019 | | 1/23/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/23/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2019 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 1/23/2019 | | DONE |
|
|
|
|
1st review completed | | | 1/17/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/16/2019 | | 1/17/2019 | | FAIL |
Josh Bogle
|
|
|
fire access not shown
|
Application received | | | 1/16/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2019 2:40PM
|
Intake Approval | | | 1/16/2019 | | PASS |
|
|
|
|
Routing - PLANNING | 1/16/2019 | | 1/16/2019 | | PASS |
Colleen T Carroll
|
|
|
|