BLD-Final | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | PASS |
Mike Jordan
|
|
|
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Blower Door Test Results | 6/24/2019 | 6/24/2019 | 6/24/2019 | A | DONE |
Mike Jordan
|
|
|
4.8
|
DOC - Permit Finaled | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 4/22/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Install missed lateral brace on E1 truss in garage. Ok to insulate.
|
BLD-Wall Bracing | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Jim Sly
|
|
|
This one already had shear documented done, but I believe it was a mix up with house down the street with same lot and block, Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD-Foundation | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PASS |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 3/26/2019 | 3/27/2019 | 3/27/2019 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2019 | 2/27/2019 | 2/27/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Wrong permit called in. this lot not built yet.
|
BLD-Wall Bracing | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
Issue PAID IN FULL permit | | | 2/15/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/31/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 1/18/2019 | 1/18/2019 | 1/31/2019 | | DONE |
Rob Patrick
|
|
|
1/30 sfd L1 ePlan...1/24; Failed...1/30; Failed, No Comments Addressed
|
Routing - PLAN CHECK | 1/31/2019 | | 1/31/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 1/31/2019 | | DONE |
|
|
|
Met
|
Routing - PLAN CHECK | 1/30/2019 | | 1/30/2019 | | FAIL |
Rob Patrick
|
|
|
No comments were addressed
|
Routing - PLAN CHECK | 1/30/2019 | | 1/30/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 1/18/2019 | | 1/24/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
1st review completed | | | 1/24/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - MECHANICAL | 1/17/2019 | | 1/23/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Route to Impact Fee Review | 1/17/2019 | 1/20/2019 | 1/18/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (J_N) | 1/17/2019 | 1/17/2019 | 1/18/2019 | | DEFR |
Jenny Nelson
|
|
|
|
Routing - Addressing | 1/17/2019 | | 1/18/2019 | | PASS |
Doug Chausow
|
|
|
|
Application received | | | 1/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 17 2019 10:10AM
|
Intake Approval | | | 1/17/2019 | | FAIL |
|
|
|
1.The Calcs and the ACHD receipt are named the exact same. Can you please re-upload them with different file names in the document folder. (we can delete the current files once they have been re-uploaded)
2. Please provide the stair section details showing the treads and risers requirements.
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/17/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/17/2019 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 1/17/2019 | | 1/17/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 1/17/2019 | | 1/17/2019 | | PASS |
Sue Cummings
|
|
|
|