BLD-Framing/Rough-in | 1/24/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Jim Sly
|
|
|
call for access- Chris Phone #: ###-#### Frame and Energy.....Pass.
|
Routing Walk-In (BLD) | 1/23/2019 | 1/23/2019 | 1/23/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 1/23/2019 | 1/23/2019 | 1/23/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 1/23/2019 | | 1/23/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 1/23/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/23/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 1/23/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 1/23/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/23/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/23/2019 | | DONE |
|
|
|
changing how many walls are being added
|
Routing Walk-In (BLD) | 1/22/2019 | 1/22/2019 | 1/22/2019 | A | FAIL |
Brian McGowan
|
|
|
Wanted to verify information prior to doing a Plan Modification
|
CHANGE STATUS TO (REV) | | | 1/22/2019 | | DONE |
|
|
|
plan mod walk in
|
Routing - PLAN CHECK | 1/22/2019 | | 1/22/2019 | | FAIL |
Brian McGowan
|
|
|
Wanted to verify with Mechanical before doing a modification.
|
CHANGE STATUS TO (ISS) | | | 1/22/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/22/2019 | | DONE |
|
|
|
walk in with a plan mod-got Brian M
|
Issue PAID IN FULL permit | | | 1/18/2019 | | DONE |
|
|
|
|
Plan assigned to (RDP) | 1/17/2019 | 1/17/2019 | 1/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing Walk-In (BLD) | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 1/17/2019 | | 1/17/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 1/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 1/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 1/17/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/17/2019 | | DONE |
|
|
|
Need- met
Value (so fee can be added)
|
Application received | | 1/17/2019 | | | |
|
|
|
|