BLD-Final | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Roberts
|
DOC - Permit Finaled | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Blower Door Test Results | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Roberts/// 3.68
|
BLD-Final | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | NH |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Mark Roberts
|
BLD-Energy code compliance | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Energy code compliance | 5/20/2019 | 5/20/2019 | 5/20/2019 | A | NR |
Tony Young
|
|
|
frame corrections have been completed Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Framing/Rough-in | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Eells,, ok to insulate,, brace gables per engineering
|
BLD-Wall Bracing | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Tony Young
|
|
|
Working set on site with framer is approved set any questions please call Andy thank you Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Footing | 3/13/2019 | 3/14/2019 | 3/14/2019 | A | PART |
Tony Young
|
|
|
Jared Phone #: ###-####,, ok to pour this afternoon when it gets warmer
|
Issue PAID IN FULL permit | | | 2/26/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/26/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/22/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 1/30/2019 | 1/30/2019 | 2/22/2019 | | DONE |
Rob Patrick
|
|
|
02/07 sfd L1 ePlan...02/19 Failed; Wall Brace needs met
|
Routing - PLAN CHECK | 2/22/2019 | | 2/22/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/22/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 2/19/2019 | | 2/19/2019 | | FAIL |
Rob Patrick
|
|
|
Wall Brace Requirements still need met.
|
Routing - PLAN CHECK | 2/12/2019 | | 2/12/2019 | | FAIL |
Rob Patrick
|
|
|
Braced Wall Calcs need to match dwg
|
Routing - PLAN CHECK | 1/30/2019 | | 2/5/2019 | | FAIL |
Rob Patrick
|
|
|
2/5; 1st Complete...Failed...2/12 Failed; Braced Wall Calcs need to match dwg
|
1st review completed | | | 2/5/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Plan assigned to (BJM) | 1/25/2019 | 1/25/2019 | 1/30/2019 | | DEFR |
Brian McGowan
|
|
|
02/07 sfd L1 ePlan
|
Route to Impact Fee Review | 1/25/2019 | 1/28/2019 | 1/28/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 1/25/2019 | | 1/28/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 1/25/2019 | | 1/28/2019 | | PASS |
Laura Hunter
|
|
|
Changed address to: 3002 N 28th St, since the front door faces 28th St
|
Routing - PUBLIC WORKS | 1/25/2019 | | 1/25/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 1/25/2019 | | 1/25/2019 | | PASS |
Sue Cummings
|
|
|
Please reduce driveway width to 33 ft. in front setback.
|
Intake Approval | | | 1/25/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/25/2019 | | DONE |
|
|
|
|
Application received | | | 1/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 17 2019 2:58PM
|
Intake Approval | | | 1/17/2019 | | FAIL |
|
|
|
Need to upload sheets individually. Need to add crawl space access and attic access. Require smoke detectors/CO on the first floor. Is there a demo permit, or are we adding to this permit?
|