BLD-Final | 11/25/2019 | 12/2/2019 | 12/2/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 11/25/2019 | 12/2/2019 | 12/2/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.19
|
BLD-Energy code compliance | 9/23/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 9/20/2019 | 9/23/2019 | 9/23/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | PASS |
Tell Riley
|
|
|
Jorge Phone #: ###-####//soffits ok too//add 2x2 washers at portal frame bolts//add blocks front portal frame//Check at framing//
|
CHANGE STATUS TO (ISS) | | | 5/20/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 5/16/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 5/15/2019 | 5/15/2019 | 5/16/2019 | | DONE |
Rob Patrick
|
|
|
05/21 sfd L1 ePlan
|
Routing - PLAN CHECK | 5/15/2019 | | 5/16/2019 | | PASS |
Rob Patrick
|
|
|
Please add 1 hour of review time.
|
Routing - MECHANICAL | 5/15/2019 | | 5/16/2019 | | PASS |
Troy James
|
|
|
1 hr plan mod review
|
Permit Ready to Issue | | | 5/16/2019 | | DONE |
|
|
|
PLAN MOD
|
Routing - PLANNING | 5/15/2019 | | 5/15/2019 | | PASS |
Sue Cummings
|
|
|
|
Plan Modification Accepted | | | 5/15/2019 | | DONE |
|
|
|
changing floor plan (will not change set backs), rescheck and manual j
|
BLD-Foundation | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2088708888 >> Inspection requested via mobile web by Wes
|
BLD-Footing | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2084078920 >> Inspection requested via mobile web by Juan
|
PubWorks Subgrade Approval | 4/18/2019 | 4/18/2019 | 4/18/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/28/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/28/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/27/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 1/23/2019 | 1/23/2019 | 2/27/2019 | | DONE |
Rob Patrick
|
|
|
2/6 sfd L1 ePlan...1/28 Failed: Corrections Required...2/6 Failed; need engineering...02/25 sheet 4 needs engineering
|
Routing - PLAN CHECK | 2/27/2019 | | 2/27/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2019 | | DONE |
Rob Patrick
|
|
|
|
Override - Parcel Holds | | | 2/27/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 2/27/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/25/2019 | | 2/25/2019 | | FAIL |
Rob Patrick
|
|
|
Sheet 4 has corrections
|
Routing - PLAN CHECK | 2/12/2019 | | 2/12/2019 | | FAIL |
Rob Patrick
|
|
|
Requested Garage Beam Details
|
Routing - Design Review | 2/11/2019 | | 2/11/2019 | | PASS |
Josh Wilson
|
|
|
No DR Required
|
Routing - PLAN CHECK | 2/6/2019 | | 2/6/2019 | | FAIL |
Rob Patrick
|
|
|
Need engineering
|
1st review completed | | | 1/28/2019 | | FAIL |
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 1/23/2019 | | 1/28/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Route to Impact Fee Review | 1/23/2019 | 1/26/2019 | 1/24/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 1/23/2019 | 1/23/2019 | 1/24/2019 | | PASS |
Lee G Meredith
|
|
|
New SFH Sprinklers not required. Adequate access, fire flow and uder size requirements.
|
Routing - MECHANICAL | 1/23/2019 | | 1/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/23/2019 | | 1/23/2019 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 1/23/2019 | | 1/23/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 1/23/2019 | | 1/23/2019 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/23/2019 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/23/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/23/2019 | | PASS |
|
|
|
|
Application received | | | 1/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 21 2019 2:27PM
|