BLD-Aging Inspection | 12/4/2019 | 12/4/2019 | 12/10/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/3/2019 | 12/3/2019 | 12/3/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PART |
Tell Riley
|
|
|
Call ahead // Scott Phone #: ###-####//framing changes on plans made for interior//trades passed//will need inspections for deck structural//
|
BLD-Conference | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PART |
Tony Young
|
|
|
Scott Phone #: ###-####-Scott called changed insp from 7/10 to 7/11 AM,, general ?s,, needs mech permit,, plans
|
Routing Walk-In (BLD) | 3/12/2019 | 3/12/2019 | 3/12/2019 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 2/20/2019 | 2/20/2019 | 3/12/2019 | | PASS |
Josh Bogle
|
|
|
2/25 remodel, paper - 1st done
|
Routing - PLAN CHECK | 3/12/2019 | | 3/12/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 3/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/12/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/8/2019 | | 3/8/2019 | | FAIL |
Josh Bogle
|
|
|
missing framing details, smokies, tempering
|
1st review completed | | | 2/25/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/20/2019 | | 2/25/2019 | | FAIL |
Josh Bogle
|
|
|
plan lacked structural details - see Plan Review notes
|
Routing Walk-In (BLD) | 2/19/2019 | 2/19/2019 | 2/20/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a Level 2
|
Plan Reviewer's activity | | | 2/20/2019 | | DONE |
Josh Bogle
|
|
|
emailed Nick & Joann asking for ACCA report
|
Intake Approval | | | 1/22/2019 | | FAIL |
|
|
|
Plans must be uploaded as individual sheets with correct file names (example Floor Plan or A1 Floor Plan).
|
Application received | | | 1/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 21 2019 4:01PM
|