BLD-Final | 2/11/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Tell Riley
|
|
|
Drew Phone #: ###-####//final complete smoke and co detectors installed//garage separation wall taped//
|
DOC - Permit Finaled | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 10/14/2019 | 10/18/2019 | 10/18/2019 | P | FAIL |
Tell Riley
|
|
|
DREW Phone #: ###-####//need to add smoke detectors per plans and code for addition and existing home to meet code requirements//fire tape garage separation wall//
|
BLD-Final | 10/11/2019 | 10/14/2019 | 10/14/2019 | A | CANC |
Tell Riley
|
|
|
Drew Phone #: ###-####//cancel per Judith//will reschedule//
|
BLD-Aging Inspection | 9/4/2019 | 9/4/2019 | 9/4/2019 | | PASS |
Tell Riley
|
|
|
Expires: 10/19/19
|
BLD-Framing/Rough-in | 4/19/2019 | 4/22/2019 | 4/22/2019 | A | PASS |
Jim Sly
|
|
|
Drew Phone #: ###-#### Frame and Energy ......OK.
|
BLD-Concrete | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Jim Sly
|
|
|
vapor barrier // Drew Phone #: ###-#### Vapor barrier and insulation underfloor.....OK
|
Routing Walk-In (Zoning) | 1/22/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 1/22/2019 | 1/22/2019 | 1/22/2019 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 1/22/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 1/22/2019 | | 1/22/2019 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 1/22/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 1/22/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 1/22/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/22/2019 | | DONE |
|
|
|
|
Application received | | 1/22/2019 | | | |
|
|
|
|