BLD-Final | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Tell Riley
|
|
|
Rescheduled with mechanical finalized. Phone #: ###-#### Inspection requested via web by James McGuire///HVAC final complete//final complete per plans// CC issued//
|
DOC - Permit Finaled | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | CANC |
Tell Riley
|
|
|
Rescheduled with mechanical finalized. Phone #: ###-#### Inspection requested via web by James McGuire
|
BLD-Conference | 6/24/2019 | 6/25/2019 | 6/25/2019 | P | CANC |
Tell Riley
|
|
|
Rescheduled with mechanical finalized. Phone #: ###-#### Inspection requested via web by James McGuire
|
BLD-Final | 6/19/2019 | 6/20/2019 | 6/20/2019 | A | NR |
Tell Riley
|
|
|
Mike Phone #: ###-####//needs HVAC final inspection//
|
BLD-Framing/Rough-in | 4/12/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Brandon Shaw
|
|
|
Insulation...
|
Routing - MECHANICAL | 4/9/2019 | | 4/9/2019 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Framing/Rough-in | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PASS |
Jim Sly
|
|
|
James Phone #: ###-####
|
BLD-Wall cover | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Jim Sly
|
|
|
Shane Phone #: ###-#### Shear.....OK.
|
BLD-Conference | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Jim Sly
|
|
|
Foundation stem wall. Phone #: ###-#### Inspection requested via web by James McGuire
|
BLD-Footing | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Jim Sly
|
|
|
James Phone #: ###-####
|
BLD-Framing/Rough-in | 2/19/2019 | 2/20/2019 | 2/20/2019 | A | PART |
Brandon Shaw
|
|
|
James-partial-interior only
|
Issue PAID IN FULL permit | | | 2/8/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/5/2019 | | DONE |
|
|
|
emailed the owner/applicant and asked if they were going to be acting as their own GC and RP, or if they are hiring a GC. If so, they will need an RP as well - the GC on the app is not registered in the state of Idaho.
|
Permit Ready to Issue | | | 2/5/2019 | | DONE |
|
|
|
Met - Need GC form
Met - Need RP
|
Plan assigned to (JAB) Josh | 1/25/2019 | 1/25/2019 | 2/4/2019 | | PASS |
Josh Bogle
|
|
|
1/31 addition, ePlan - 1st done
|
Routing - PLAN CHECK | 2/4/2019 | | 2/4/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Routing - PLAN CHECK | 1/25/2019 | | 1/28/2019 | | FAIL |
Josh Bogle
|
|
|
see Plan Review Notes
|
1st review completed | | | 1/28/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 1/25/2019 | | 1/25/2019 | | PASS |
Sue Cummings
|
|
|
|
Intake Approval | | | 1/25/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/25/2019 | | DONE |
|
|
|
|
Application received | | | 1/22/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 22 2019 2:41PM
|
Intake Approval | | | 1/22/2019 | | FAIL |
|
|
|
Load sheets individually. Need total height of building.
|