Permit Information
Permit NumberBLD19-00262
StatusIssued
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 487 N MORNINGSIDE WAY
Project NameMorningside Residence
Customer Number 
ePlanReviewYes
Description
CAT II hillside permit **WUI FOOTHILLS ZONE A REQUIREMENTS** **HILLSIDE** **PASSES USING UA TRADE OFF** **310 SPECIAL INSPECTIONS** **Permit includes engineered pool** SPRINKLERS ARE REQUIRED. SEE NOTE ON SITE PLAN G-001. LGM Permit for the construction of a new 4145 sq. ft., two story (first story 2921 sq. ft., basement story 1224 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 1564 sq. ft. of covered patio/porch and a 3124 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. JJN SPRINKLERS ARE REQUIRED. SEE NOTE ON SITE PLAN G-001. LGM
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing8/12/20208/13/20208/13/2020APART
DetailsDave Hannah
Screened- James Phone #: ###-#### ok to cover ext but shear panel on 7 line needs to be reengineered hold downs in wrong spots and window added.
Routing - MECHANICAL7/27/2020 7/27/2020 PASS
DetailsTroy James
Resubmitted acca report
BLD-Aging Inspection6/4/20206/4/20206/4/2020 DEFR
DetailsBrandon Shaw
Extend Permit 90/180 days6/4/20206/4/20206/4/2020PDONE
DetailsBrandon Shaw
BLD-Foundation1/21/20201/22/20201/22/2020PPASS
DetailsBrandon Shaw
First floor slab and interior footings...
BLD-Footing12/3/201912/4/201912/4/2019APASS
DetailsBrandon Shaw
Mark Phone #: ###-####
BLD-Foundation11/1/201911/1/201911/1/2019PPASS
DetailsDave Hannah
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing10/30/201910/30/201910/30/2019PPASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval10/30/201910/30/201910/30/2019 DONE
DetailsMelissa Jannusch
*GARAGE AND EAST RETAINING WALL* A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Foundation9/13/20199/16/20199/16/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation8/9/20198/12/20198/12/2019APART
DetailsBrandon Shaw
Back East wall only....
BLD-Footing8/1/20198/1/20198/1/2019PPASS
DetailsBrandon Shaw
Entire residence and pool footings...
Work in progress...
PubWorks Subgrade Approval7/31/20197/31/20197/31/2019 DONE
DetailsMelissa Jannusch
Entire residence and pool footings. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing7/25/20197/25/20197/25/2019PNR
DetailsBrandon Shaw
Need soil subgrade submitted and approved by PW...
BLD-Footing7/22/20197/23/20197/23/2019ANR
DetailsBrandon Shaw
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing7/19/20197/19/20197/19/2019PNR
DetailsJim Storey
Wes Phone #: ###-#### A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Issue PAID IN FULL permit  3/26/2019 DONE
Print Occupancy Form  3/26/2019 DONE
Plan assigned to (J_N)1/30/20191/30/20193/25/2019 DONE
DetailsJenny Nelson
02/15 #404 L2 ePlan. 2nd complete 3/07, composite siding doesn't comply with WUI. 1st complete 2/11, need to specify wui soffit, clarify chimney, provide icc esr, clarify emergency escape openings for master bed, specify pool barrier
Routing PW Grading-Hillside3/25/2019 3/25/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
PLANS/APPL TAKEN TO FRONT DESK  3/25/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  3/25/2019 DONE
MET
need RP
Routing - PLAN CHECK3/15/2019 3/15/2019 PASS
DetailsJenny Nelson
Routing PW Grading-Hillside3/13/2019 3/13/2019 FAIL
DetailsMelissa Jannusch
See changemarks from review #1
Routing - PLAN CHECK3/7/2019 3/7/2019 FAIL
DetailsJenny Nelson
1st review completed  2/11/2019 FAIL
DetailsJenny Nelson
Routing - PLAN CHECK1/29/2019 2/11/2019 FAIL
DetailsJenny Nelson
Routing - PLANNING1/29/2019 2/11/2019 PASS
DetailsSusan Riggs
Routing PW Grading-Hillside1/29/2019 2/4/2019 FAIL
DetailsMelissa Jannusch
See changemarks on ePlan or revisions requested in the CFH letter.
Routing - MECHANICAL1/29/2019 1/31/2019 PASS
DetailsChad Schwendiman
Route to Impact Fee Review1/29/20192/1/20191/30/2019 PASS
DetailsKarina Myles
Initial residential review of new SFD permits requested for now.
Plan assigned to (M_H)1/29/2019 1/30/2019 DEFR
DetailsMichael Hanson
02/15 #404 L2 ePlan
Routing - Erosion and Sediment1/29/2019 1/30/2019 PASS
DetailsMichael Zawacki
Foothills home, site prep inspection required.
Routing - FIRE1/29/20191/29/20191/29/2019 PASS
DetailsLee G Meredith
Inadequate fire flow and maximum access distance has been exceeded.

3-6-19 Resubmittal. Applicant added note to Site Drawing G-001 now has an added note that indicates a sprinkler system will be provided.
Intake Approval  1/29/2019 PASS
Recd Pcfee & Taken To Pln CK  1/29/2019 DONE
Routing - Addressing1/29/2019 1/29/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/29/2019 1/29/2019 PASS
DetailsAngela Hardy
Application received  1/23/2019 DONE
Application submitted via PDS Online on Jan 23 2019 4:51PM