Permit Information
Permit NumberBLD19-00268
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5928 E HOOTOWL DR
Project NameHarris North #1 Lot 4 Block 2
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2413 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 281 sq. ft. of covered patio/porch and a 736 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning. ***RDP*** NO SPRINKLERS REQUIRED. LGMA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20197/25/20197/25/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled7/25/20197/25/20197/25/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/25/20197/25/20197/25/2019ADONE
DetailsBrandon Shaw
ACH50- 3.86
PubWorks Occupancy Approval7/25/20197/25/20197/25/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance4/23/20194/23/20194/23/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in4/22/20194/22/20194/22/2019PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick truss rep to supply sign off a1 out of plmb// a13 web brace/ hvac cut out king stud overspacing for bearing wall.
BLD-Other4/22/20194/22/20194/22/2019PPASS
DetailsJim Storey
Soffit please Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing3/28/20193/29/20193/29/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation3/12/20193/12/20193/12/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Foundation3/11/20193/12/20193/12/2019ACANC
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled from web by: Kyle Seick
BLD-Foundation3/11/20193/12/20193/11/2019ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled via mobile web on Monday, March 11, 2019.
BLD-Foundation3/10/20193/11/20193/11/2019AFAIL
DetailsMike Jordan
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell. Reinforcement not per plan.
BLD-Conference3/10/20193/11/20193/10/2019ACANC
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Sunday, March 10, 2019.
BLD-Footing3/8/20193/8/20193/9/2019PPASS
DetailsJim Sly
Edgar Phone #: ###-####
PubWorks Subgrade Approval3/6/20193/6/20193/6/2019 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  2/15/2019 DONE
Inspection Record Card- Bld  2/15/2019 DONE
OVERRIDE  2/7/2019  
Plan assigned to (RDP)1/30/20191/30/20192/7/2019 DONE
DetailsRob Patrick
02/13 sfd L2 ePlan...1st Complete. Failed for Braced wall
Routing - PLAN CHECK1/30/2019 2/7/2019 FAIL
DetailsRob Patrick
Need Braced Wall Materials
1st review completed  2/7/2019 FAIL
DetailsRob Patrick
Routing - PLAN CHECK2/7/2019 2/7/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/7/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  2/7/2019 DONE
met
Routing - PLANNING1/25/2019 2/6/2019 PASS
DetailsSue Cummings
Plan assigned to (BJM)1/25/20191/25/20191/30/2019 DEFR
DetailsBrian McGowan
02/13 sfd L2 ePlan
Route to Impact Fee Review1/25/20191/28/20191/28/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.

Impact fees assessed at $2,562.37 are correct for the North River area of impact. SLC
Routing - Erosion and Sediment1/25/2019 1/28/2019 PASS
DetailsMichael Zawacki
Foothills sub, site prep inspection required.
Routing PW Grading-Hillside1/25/2019 1/28/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - FIRE1/25/20191/25/20191/25/2019 PASS
DetailsLee G Meredith
No Sprinklers Required.
Routing - Addressing1/25/2019 1/25/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS1/25/2019 1/25/2019 PASS
DetailsMorgan Webb
Routing - MECHANICAL1/25/2019 1/25/2019 PASS
DetailsTroy James
Intake Approval  1/25/2019 PASS
Plans ACCEPTED BY PLAN TECH  1/25/2019 DONE
Recd Pcfee & Taken To Pln CK  1/25/2019 DONE
Application received  1/24/2019 DONE
Application submitted via PDS Online on Jan 24 2019 9:47AM