Permit Information
Permit NumberBLD19-00269
StatusFinaled
Name L & L RETAIL CONSTRUCTION LLC
Site Address 291 N MILWAUKEE ST
Project NameEyemart Express
Customer Number 
ePlanReviewYes
Description
(EYEMART EXPRESS) **PLANS MODIFIED TO REFLECT ACTUAL EXPANSION AREA AS-BUILT** **SEE STRUCTRAL ENGINEERING AND DETAIL FOR REQUIRED STRUCTURAL COMPONENTS AT NEW RTU LOCATION*** Permit to add 760 sqft. of vacant existing adjacent space to an exisitng 4,428 sqft for a total of 5,188 sqft.. The current tenant is Eyemart occupied under BLD14-00484. The new space will include (2) additional exam rooms, (1) VF testing room, (1) CL Trials room, and (1) Pre-test room. Work to include: adding new 2x6 non-load bearing interior walls, (2) side hinged doors, (3) pocket doors, frame over (1) existing exterior door at back, finishes, furniture, replace (1) existing RTU, mechanical, plumbing, and electrical work. Demo work includes a 7'-6" hole in the existing demising wall to join the two spaces and remove cabinetry and relocate sink. This building is fully fire sprinkled. Any alterations or modifications to the buildings Fire Sprinkler WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13(R) as regulated by the Boise Fire Department. Approval of this permit is contingent on adhering to the approved plans. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/18/20194/25/2019 DONE
This permit finaled on the web by Amy Sauceman
First Notice 4/1/20194/8/2019 DONE
mailed 4/11
BLD-Final3/21/20193/22/20193/22/2019APASS
DetailsMike Jordan
Mark Phone #: ###-####. OK for perm occ. Also reviewed letter from SMBH Structural engineers noting that the existing roof framing is adequate to support the new RTU. New RTU installed and existing curbing was used.
Print Occupancy Form  3/22/2019 DONE
Permanent Occupancy  3/22/2019  
FIRE-Final Inspection3/20/20193/21/20193/21/2019PPASS
DetailsTroy Cobbley
Life safety passed. Mark Phone #: ###-####
BLD-Framing/Rough-in3/19/20193/20/20193/20/2019APASS
DetailsMike Jordan
Mark Phone #: ###-####
BLD-Ceiling Grid Inspection3/20/20193/20/20193/20/2019APASS
DetailsMike Jordan
Mark Phone #: ###-####
BLD-Ceiling Grid Inspection3/15/20193/18/20193/18/2019ANR
DetailsMike Jordan
Mark Phone #: ###-####
CHANGE STATUS TO (ISS)  3/6/2019 DONE
Print Occupancy Form  3/6/2019 DONE
Plan assigned to (M_H)2/28/2019 3/5/2019 DONE
DetailsMichael Hanson
03/06 #518 plan mod. Plan check complete, pending mechanical and plumbing review.
Routing - PLAN CHECK3/4/2019 3/5/2019 PASS
DetailsMichael Hanson
2 hour plan mod review fee
Routing - MECHANICAL3/4/2019 3/5/2019 PASS
DetailsTroy James
Routing - PLUMBING3/4/2019 3/5/2019 PASS
DetailsDan Ediger
Per ISPC
Permit Ready to Issue  3/5/2019 DONE
Plan Modification Accepted  2/28/2019 DONE
interior modified extent of expansion space based on existing demising walls (15'-9' 1/4"(w)X 46' - 9 1/2"(L)). interior partition walls within expansion area shifted per dug. related MEP work modified respectively
Issue PAID IN FULL permit  2/19/2019 DONE
Inspection Record Card- Bld  2/19/2019 DONE
Route to Impact Fee Review2/14/20192/17/20192/15/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Plan assigned to (M_H)2/13/2019 2/15/2019 DONE
DetailsMichael Hanson
02/14 #518 L2 ePlan. Eyemart Express
Case Summary (BLD)  2/15/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  2/15/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  2/15/2019 DONE
Need GC
Need Revised Value
NO IMPACT FEES DUE per Mike: please make sure the impact fees have signed off before the permit is issued
1st review completed  2/14/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK1/31/2019 2/14/2019 PASS
DetailsMichael Hanson
Plan assigned to (BJM)1/31/20191/31/20192/13/2019 DEFR
DetailsBrian McGowan
02/14 L2 Eyemart Express ePlan
Routing - MECHANICAL1/31/2019 2/7/2019 PASS
DetailsChad Schwendiman
Routing - PLUMBING1/31/2019 2/5/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - Addressing1/31/2019 2/1/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/31/2019 2/1/2019 PASS
DetailsMorgan Webb
Intake Approval  1/31/2019 PASS
DetailsJavier Guzman
Intake Approval  1/28/2019 FAIL
DetailsMichael Hanson
Provide information on the existing RTU to ensure the existing structure is able to support the new RTU. Weight of the old and new must be provided and/or structural engineering analysis.
Application received  1/24/2019 DONE
Application submitted via PDS Online on Jan 24 2019 10:56AM