BLD-Wall cover | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PASS |
Jim Storey
|
|
|
Basement wall covering inspection. Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | A | PASS |
Jim Storey
|
|
|
Basement wall covering inspection. Phone #: ###-#### Inspection requested via web by Noah Richter back deck ok to cover
|
BLD-Footing | 4/20/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Brandon Shaw
|
|
|
Deck footings inspection. Phone #: ###-#### Inspection requested via web by Noah Richter
|
Routing - MECHANICAL | 4/20/2020 | | 4/20/2020 | | PASS |
Troy James
|
|
|
submitted ACCA report
|
BLD-Framing/Rough-in | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Brandon Shaw
|
|
|
Basement OK to insulate...
|
BLD-Wall Bracing | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Dave Hannah
|
|
|
Sheer wall inspection on daylight basement exterior wall. Phone #: ###-#### Inspection requested via web by Noah Richter
|
PubWorks Subgrade Approval | 1/23/2020 | 1/23/2020 | 1/23/2020 | | DONE |
Melissa Jannusch
|
|
|
**6 isolated pad and an exterior footing on the west side of the home**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 1/17/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
Brandon Shaw
|
|
|
Request footing inspection before 8:30 a.m. Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Energy code compliance | 12/12/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Conference | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | DONE |
Brandon Shaw
|
|
|
Insulation/ conditioned space conference Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Conference | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | DONE |
Brandon Shaw
|
|
|
Framing conference Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Other | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | PASS |
Brandon Shaw
|
|
|
Masonry fireplace Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Wall cover | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Partial sheer inspection for garage Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Wall cover | 9/13/2019 | 9/16/2019 | 9/16/2019 | A | PASS |
Brandon Shaw
|
|
|
Partial sheer inspection on pool house walls Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Foundation | 8/28/2019 | 8/29/2019 | 8/29/2019 | A | DONE |
Tony Young
|
|
|
Noah; Phone #: ###-####
|
BLD-Footing | 8/23/2019 | 8/26/2019 | 8/26/2019 | A | PASS |
Brandon Shaw
|
|
|
Garage and pool house footings. Please inspect late AM. Concrete is scheduled for 1 PM. Prefer inspection around 11:30-12:00. Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Foundation | 8/15/2019 | 8/15/2019 | 8/15/2019 | A | PASS |
Brandon Shaw
|
|
|
Retaining wall inspection. Work in progress...
|
BLD-Footing | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Brandon Shaw
|
|
|
Retaining wall and Sono tube in backyard. Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Energy code compliance | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PART |
Brandon Shaw
|
|
|
Partial inspection of closed cell insulation on main living roof section.
|
BLD-Wall Bracing | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Richter/// partial,, front entry area,, rear gable wall,, noted on plans
|
BLD-Foundation | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Noah Richter back retaining wall rebar ok
|
BLD-Footing | 7/19/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Brandon Shaw
|
|
|
Will be ready by noon Inspection requested via web by Noah Richter
|
BLD-Footing | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Footing | 6/14/2019 | 6/18/2019 | 6/18/2019 | A | CANC |
Tony Young
|
|
|
>> Inspection requested via web by Noah Richter cancel per noah
|
BLD-Concrete | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Richter,, front porch walls,, rear retaining walls ok,, north brace walls ok also
|
BLD-Wall Bracing | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | PART |
Dave Hannah
|
|
|
Partial sheer inspection for partial to cover. Phone #: ###-#### Inspection requested via web by Noah Richter ext house west side ext nailing ok
|
BLD-Footing | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Tony Young
|
|
|
This is for two piers out front and they will be ready by 11:00. We have concrete called for 12:00. Phone #: ###-#### Inspection requested via web by Noah Richter
|
BLD-Footing | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Noah Richter,, pool reatianing wall footers on SW corner of lot.
|
BLD-Footing | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PART |
Tony Young
|
|
|
Rebar will be in place by 12:00 and we have concrete showing up at 1:00 today. Give me a call if you have any questions. Thank you again and we look forward to seeing you soon. Noah Richter Phone #: ###-#### Inspection requested via web by Noah Richter,, front entry wall footings,, front retaining wall footings
|
PubWorks Subgrade Approval | 6/4/2019 | 6/4/2019 | 6/4/2019 | | DONE |
Melissa Jannusch
|
|
|
ADDITIONAL AND WALL ONLY. POOL NOT APPROVED YET. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
CHANGE STATUS TO (ISS) | | | 5/30/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 5/17/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/2/2019 | 5/2/2019 | 5/17/2019 | | PASS |
Josh Bogle
|
|
|
5/8 retaining wall, ePlan - resubmittal, waiting on applicant download
|
Routing - PLAN CHECK | 5/9/2019 | | 5/17/2019 | | PASS |
Josh Bogle
|
|
|
no changes to retaining wall structure
|
Permit Ready to Issue | | | 5/17/2019 | | DONE |
|
|
|
plan mod
|
Routing - PLANNING | 5/16/2019 | | 5/16/2019 | | PASS |
Nicolette Womack
|
|
|
Driveway width cannot exceed 33' in width within the front yard setback. Inspection Required.
|
Routing PW Grading-Hillside | 5/9/2019 | | 5/13/2019 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling inspections. Please allow 24 hours for subgrade approval processing. If you have any questions call Melissa Jannusch ###-####.
|
Routing - PUBLIC WORKS | 5/9/2019 | | 5/9/2019 | | PASS |
Morgan Webb
|
|
|
|
Plan Modification Accepted | | | 5/2/2019 | | DONE |
|
|
|
changing retaining wall
|
Issue PAID IN FULL permit | | | 4/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/9/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/18/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/1/2019 | 2/1/2019 | 3/18/2019 | | PASS |
Josh Bogle
|
|
|
2/7 remodel, ePlan - 1st done
|
Routing - PLAN CHECK | 3/7/2019 | | 3/18/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/18/2019 | | DONE |
|
|
|
all met
GC FORM
RP (IF NOT PARCEL OWNER)
|
Routing PW Grading-Hillside | 3/7/2019 | | 3/15/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call ###-#### to schedule an inspection.
|
Plan Reviewer's activity | | | 3/7/2019 | | DONE |
Josh Bogle
|
|
|
accepted resubmittal & routed
|
Routing - PLAN CHECK | 2/19/2019 | | 2/28/2019 | | FAIL |
Josh Bogle
|
|
|
#310 needs owner signature and cable rail tensioning info
|
Routing PW Grading-Hillside | 2/19/2019 | | 2/27/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - FIRE | 2/19/2019 | 2/19/2019 | 2/20/2019 | | PASS |
Lee G Meredith
|
|
|
New Suez letter issues for additional fire flow at a reduced time that was acceptable to Assistan Fire Marshal Ron Johnson.
|
Plan Reviewer's activity | | | 2/19/2019 | | DONE |
Josh Bogle
|
|
|
accepted resubmittal - routed to Fire, Grading-Hillside, Plan Check
|
1st review completed | | | 2/7/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/1/2019 | | 2/7/2019 | | FAIL |
Josh Bogle
|
|
|
needs #310 form, big WUI wood, sprinklers - see e-mail to Derek Hurd 3.7.19
|
Routing - FIRE | 2/1/2019 | 2/1/2019 | 2/4/2019 | | FAIL |
Lee G Meredith
|
|
|
Inadequate fire flow available. Emailed applicant.a copy of the review comments.
|
Routing PW Grading-Hillside | 2/1/2019 | | 2/4/2019 | | FAIL |
Melissa Jannusch
|
|
|
Please upload full civil set prior to building permit review. C3, C4, C4.5 are missing.
|
Routing - Erosion and Sediment | 2/1/2019 | | 2/1/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills lot, site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 2/1/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/1/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/1/2019 | | DONE |
|
|
|
no fees taken at intake
|
Routing - PLANNING | 2/1/2019 | | 2/1/2019 | | PASS |
Sue Cummings
|
|
|
Please make sure 10 ft. setback is maintained along the patio post
|
Routing - PUBLIC WORKS | 2/1/2019 | | 2/1/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 1/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 25 2019 2:35PM
|
Routing - PLANNING | 5/9/2019 | | | | FAIL |
|
|
|
Driveway exceeds maximum width of 33 ft. in front setback
|