Print Statement | | | 1/8/2020 | | DONE |
|
|
|
|
Third Notice | | 11/30/2019 | 12/18/2019 | | DONE |
|
|
|
This permit finaled on the web by Jay Bedsole
|
Second Notice | | 11/4/2019 | 11/25/2019 | | DONE |
|
|
|
mailed 12-2-19
|
First Notice | | 9/30/2019 | 10/25/2019 | | DONE |
|
|
|
mailed 11-1-19
|
BLD-Final | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Brandon Shaw
|
|
|
Caleb- Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Brandon Shaw
|
|
|
|
Print Occupancy Form | | | 9/20/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/20/2019 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarm modificaitons, fire extinguisher is placed with a current inspection tag, round type door hardware on breakroom door to be changed to lever type before building final, will be verified during final inspection. Final life fire safety inspection for area of work complete, signature card not provided, no signatures given.
Kaleb Phone #: ###-####
|
FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | CANC |
Troy Cobbley
|
|
|
Could not make it to this inspection due to work load and time constriants. Will need to be rescheduled. Caleb Phone #: ###-####
|
BLD-Final | 8/25/2019 | 8/26/2019 | 8/29/2019 | A | CANC |
Dave Hannah
|
|
|
The building will be open after 9. Just ask for Becca. Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
FIRE-Final Inspection | 8/27/2019 | 8/28/2019 | 8/28/2019 | A | FAIL |
Jim Page
|
|
|
Provide code compliant door hardware for breakroom door. Provide a fire extinguisher with a current ispection tag, current tag is from 1986. Thumbturn deadbolt on main entry needs to be changed to a double-key deadbolt and provide signage at main door reading "Door to remain unlocked while building is occupied".
The building will be open at 9. Ask for Becca at the front desk. She has the approved plans. Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
|
FIRE-Final Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | FAIL |
Troy Cobbley
|
|
|
Left message on contacts voice mail that I was on the way. Got to project site but did not make contact with anyone except the owner. She did not have plans. No inspection performed. Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 5/15/2019 | 5/15/2019 | 5/15/2019 | A | PASS |
Tony Young
|
|
|
Just inspection of the remaining rooms. Should be the front 2 rooms on the west side. The goal is to have the whole building approved for cover. Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole// ok after fixing the insulation
|
BLD-Framing/Rough-in | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PART |
Dave Hannah
|
|
|
Please give me a call. I would like an inspection on the rooms on the north side and the 3 rooms on the north west side, and the rooms in the center of the building. I have marked the plans with NO on the rooms that are not ready. The plans are on the table in the room on the south west corner of the building. Thank you. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole ok to cover rooms ok by elec
|
BLD-Framing/Rough-in | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PART |
Brandon Shaw
|
|
|
I need a rough in inspection on the east half of the building only. I'd like to hang sheet rock on that half only, so just an ok to cover the walls and ceiling on that half is the goal. OK to cover as requested...
|
Issue PAID IN FULL permit | | | 3/11/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/11/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 2/15/2019 | 2/15/2019 | 3/4/2019 | | PASS |
Joe Bruce
|
|
|
03/08 (1st Resub) - (L2) SPARKMD ePlan
|
Routing - PLAN CHECK | 3/4/2019 | | 3/4/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/4/2019 | | DONE |
|
|
|
NEED
GC FORM
REVISED VALUE
|
Plan resubmittals received | | | 3/1/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 2/27/2019 | 3/2/2019 | 2/28/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 2/15/2019 | | 2/27/2019 | | FAIL |
Joe Bruce
|
|
|
|
1st review completed | | | 2/27/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 2/27/2019 | | DONE |
Joe Bruce
|
|
|
Emailed plan review report to Phillip. **JHB**
|
Routing - PLUMBING | 2/15/2019 | | 2/15/2019 | | PASS |
Dan Ediger
|
|
|
Per ISPC and plans
|
Routing - Addressing | 2/15/2019 | | 2/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/15/2019 | | 2/15/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing PW Environmental | 2/15/2019 | | 2/15/2019 | | PASS |
Terry Alber
|
|
|
No Pretreatment Issues
|
Intake Approval | | | 2/14/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 1/31/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Show on plans lighting fixture schedule for new lighting being installed (show list of fixture type, wattage, ballast bulb type, fixture count, switching requirements including daylighting if any)
• Plumbing plans required for medical facility that are stamped and signed by an Idaho licensed engineer
|
Application received | | | 1/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 25 2019 2:43PM
|