First Notice | | 9/1/2019 | 9/19/2019 | | DONE |
|
|
|
mailed 9-20-19
|
Permanent Occupancy | | | 8/22/2019 | | DONE |
|
|
|
|
BLD-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Tell Riley
|
|
|
Brian Phone #: ###-####//ok per plans//pending mechanical passing later this afternoon//
|
FIRE-Final Inspection | 8/20/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Brian Phone #: ###-####
|
Plan assigned to (JG) | 8/19/2019 | 8/19/2019 | 8/21/2019 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod Dr Minert DBA Boise Dentistry ePlan
|
Routing - MECHANICAL | 8/21/2019 | | 8/21/2019 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/21/2019 | | DONE |
|
|
|
|
Routing - MECHANICAL | 8/19/2019 | | 8/21/2019 | | FAIL |
Troy James
|
|
|
Chad left message with architect and talked to the mechanical engineer. Need to remove the fire damper and exhaust fan. Show the med gas room as exterior room.
|
FIRE-Final Inspection | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need the NFPA signage as discussed and the building plan mods provided.
Brian Phone #: ###-####
|
BLD-Final | 8/19/2019 | 8/20/2019 | 8/20/2019 | A | NR |
Tell Riley
|
|
|
Brian Phone #: ###-####//need mechanical final//fire final scheduled for afternoon//complete fire final inspection and mechanical final//call for re-inspection//
|
Routing - FIRE | 8/19/2019 | 8/19/2019 | 8/20/2019 | | PASS |
Mark Scharfen
|
|
|
08/22 Plan Mod Dr Minert DBA Boise Dentistry review complete. UPloaded rev_fire 08.20.2019.pdf
|
Routing - PLAN CHECK | 8/20/2019 | | 8/20/2019 | | PASS |
Javier Guzman
|
|
|
|
Plan assigned to (JAR) | 8/16/2019 | 8/16/2019 | 8/19/2019 | | DEFR |
Julie Romig
|
|
|
|
Routing - Design Review | 8/19/2019 | | 8/19/2019 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 8/15/2019 | 8/16/2019 | 8/16/2019 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Wilson Inspection cancelled from web by: Brian Wilson
|
FIRE-Final Inspection | 8/15/2019 | 8/16/2019 | 8/16/2019 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Wilson Inspection cancelled from web by: Brian Wilson
|
Plan Modification Accepted | | | 8/16/2019 | | DONE |
|
|
|
an exterior steel door replace an existing store front glass window. in addition, door will also have in it 2 bents through door note# 11.1@ 12x12 and 1@ 8x16.
|
FIRE-Final Inspection | 8/14/2019 | 8/15/2019 | 8/15/2019 | P | FAIL |
Troy Cobbley
|
|
|
Need a FIR permit for the new head in the gas closet. Need NFPA signage as discussed on the gas closet door. Need the gas closet manifold/piping certified. Brian Wilson ###-####
|
BLD-Ceiling Grid Inspection | 7/21/2019 | 7/22/2019 | 7/22/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Wilson//trades passed//ok to cover grid//
|
BLD-Ceiling Grid Inspection | 7/18/2019 | 7/19/2019 | 7/19/2019 | P | NR |
Tell Riley
|
|
|
Bryan Phone #: ###-####//need trades inspections completed prior to grid cover//call for re-isnpection//
|
BLD-Framing/Rough-in | 6/18/2019 | 6/18/2019 | 6/18/2019 | P | PASS |
Tell Riley
|
|
|
penetrations sealed through plates//framing ok to cover.//
|
BLD-Framing/Rough-in | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | NR |
Tell Riley
|
|
|
brian Phone #: ###-####//complete air seal of floor/ceiling/plate penetrations. cover seal holes in ceiling.//
|
Print Occupancy Form | | | 5/9/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/6/2019 | 5/6/2019 | 5/7/2019 | | PASS |
Mark Scharfen
|
|
|
05.07.2019-completed fire code review. Uploaded Rev_fire 05.07.2019.pdf. Passed review.
|
Plan assigned to (JG) | 3/13/2019 | 3/13/2019 | 5/7/2019 | | PASS |
Javier Guzman
|
|
|
3rd rev, 04/04 L3 Minnert ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/7/2019 | | DONE |
|
|
|
Need GC
Need Rev Val
|
Routing - PLAN CHECK | 5/6/2019 | | 5/7/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 4/27/2019 | 4/27/2019 | 5/1/2019 | | FAIL |
Mark Scharfen
|
|
|
Uploaded IFC 2nd review 05.01.2019.pdf and emailed architect.
|
Routing - PLAN CHECK | 4/27/2019 | | 5/1/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 4/27/2019 | | 4/30/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC and NFPA 99.
|
Routing - MECHANICAL | 4/27/2019 | | 4/29/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 4/27/2019 | | 4/29/2019 | | PASS |
Josh Wilson
|
|
|
|
Route to Impact Fee Review | 4/4/2019 | 4/7/2019 | 4/5/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 3/13/2019 | 3/13/2019 | 4/4/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st Review 04.04.2019.pdf uploaded and emailed to applicant.
|
Routing - Design Review | 4/3/2019 | | 4/4/2019 | | FAIL |
Josh Wilson
|
|
|
Design Review approval required for new exterior door.
|
Routing - PLAN CHECK | 4/4/2019 | | 4/4/2019 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 4/4/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 3/19/2019 | | 3/19/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 3/14/2019 | | 3/18/2019 | | PASS |
Terry Alber
|
|
|
Solmetex Hg5 amalgam separator shown.
Please see https://publicworks.cityofboise.org/services/sewer/pretreatment-program/ for Dental Office BMPs and Dental BMP Coverage Application.
|
Routing - Addressing | 3/13/2019 | | 3/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/13/2019 | | 3/14/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLUMBING | 3/13/2019 | | 3/13/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC and NFPA 99.
|
Routing - PLANNING | 3/13/2019 | | 3/13/2019 | | PASS |
Nicolette Womack
|
|
|
No exterior modifications are approved.
|
Intake Approval | | | 3/11/2019 | | PASS |
|
|
|
|
Intake Approval | | | 1/29/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Reduce file size of A0.0 as our software is not robust enough to open files over 1MB.
2. Stamp, signed and dated missing from P-2.
3. Provide fire flow letter. Required even if existing and no change of occupancy.
4. A0.0 indicate fire sprinkled or note. Currently states "Non-sprinkled?"
5. Provide med gas quantities.
Revise and resubmit.
|
Application received | | | 1/27/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 27 2019 1:53PM
|