Print Statement | | | 8/13/2020 | | DONE |
|
|
|
1st past due
|
Print Statement | | | 7/22/2020 | | DONE |
|
|
|
1st mailed statement
|
Third Notice | | 4/11/2020 | 4/9/2020 | | DONE |
|
|
|
This permit finaled on the web by Kenny Elumbaugh
|
Telephone call | | | 4/8/2020 | | DONE |
|
|
|
called and spoke with Christy in accounting. She believes the final values were submitted for the wrong project. I explained to her how to submit final values online and she said she and kenny will get together and do that tomorrow. I gave her my direct phone number to call with questions.
|
Third Notice | | 3/10/2020 | 4/6/2020 | | DONE |
|
|
|
mailed 4-6-2020
|
Telephone call | | | 3/30/2020 | | DONE |
|
|
|
Emailed GC to request clarification on final values. They did not provide MEC final value, though 2 MEC permits were pulled. Gave them instructions on how to complete final values online.
|
Second Notice | | 2/17/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
First Notice | | 1/26/2020 | 2/7/2020 | | DONE |
|
|
|
mailed 2-10-20
|
BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Brandon Shaw
|
|
|
Nate Phone #: ###-####
|
DOC - Permit Finaled | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for scope of work is complete.
Nate Phone #: ###-####
|
Permanent Occupancy | | | 1/16/2020 | | DONE |
|
|
|
|
Zoning Approval | 1/6/2020 | 1/6/2020 | 1/6/2020 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 12/6/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C of O is approved for store only... All permits to be finaled when canopy and fuel island are fininshed...
|
FIRE-Final Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Troy Cobbley
|
|
|
A temp for life safety is ok'd by Joe Bruce until the gas islands have been completed/inspected. Previous corrections have been addressed. Nate Phone #: ###-####
|
FIRE-Final Inspection | 12/6/2019 | 12/9/2019 | 12/9/2019 | A | PART |
Troy Cobbley
|
|
|
A temp for life safety is ok'd by Joe Bruce until the gas islands have been completed/inspected. Previous corrections have been addressed. Nate Phone #: ###-####
|
Temporary Occupancy | 12/9/2019 | 3/8/2020 | 12/9/2019 | | DONE |
Judith Amador
|
|
|
|
Telephone call | | | 12/9/2019 | | DONE |
|
|
|
left a message for nate that this permit will not be able to get a temp occ until ele19-04685 has a partial or full final pass
|
FIRE-Final Inspection | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | NR |
Jim Page
|
|
|
A stated in th 05DEC entry: Not ready for final life fire safety inspection, FIR19-00913 is for the in duct smoke detectors, FIR permit needs to scheduled, inspected and finaled before life fire safety will be completed. It is cooridnated to be completed the morning of 09DEC2019.
Nate Phone #: ###-####
|
BLD-Conference | 12/4/2019 | 12/5/2019 | 12/5/2019 | A | DONE |
Brandon Shaw
|
|
|
Make sure everything is good to go before final on Friday // Nate Phone #: ###-####
|
FIRE-Final Inspection | 12/4/2019 | 12/5/2019 | 12/5/2019 | P | NR |
Jim Page
|
|
|
Not ready for final life fire safety inspection, FIR19-00913 is for the in duct smoke detectors, FIR permit needs to scheduled, inspected and finaled before life fire safety will be completed.
Nate- after 2:30 please and call prior if possible Phone #: ###-####
|
Zoning Approval Temp | 12/4/2019 | 12/4/2019 | 12/4/2019 | | PASS |
Katelyn Menuge
|
|
|
Bonded for Landscape
|
FIRE-Final Inspection | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | FAIL |
Jim Page
|
|
|
Provide fire extinguishers with current inspection tags. A seperate FIR permit is required for the in duct smoke detectors as well as annunciators provided for the in duct smoke detectors. Fuel island permit needs to be finaled with the fire department before life fire safety can be signed off.
Nate Phone #: ###-####
|
Print Occupancy Form | | | 12/2/2019 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PEND |
Brandon Shaw
|
|
|
Pending trades cover approval...
|
CHANGE STATUS TO (ISS) | | | 10/9/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/9/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/9/2019 | | DONE |
|
|
|
plan mod
|
(F) Reprint permit | | | 10/9/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/9/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/8/2019 | | DONE |
|
|
|
plan mod approved
|
Routing - PLAN CHECK | 10/7/2019 | | 10/7/2019 | | PASS |
Michael Hanson
|
|
|
Plan mod approval - 1 hour plan mod review fee
|
Plan assigned to (M_H) | 9/30/2019 | | 10/7/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 10/2/2019 | | 10/2/2019 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 9/30/2019 | | DONE |
|
|
|
added full mechanical HVAC drawings
|
BLD-Aging Inspection | 9/11/2019 | 9/11/2019 | 9/12/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Conference | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Aging Inspection | 9/10/2019 | 9/10/2019 | 9/10/2019 | | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
Print Occupancy Form | | | 7/25/2019 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/12/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 2/26/2019 | | 3/1/2019 | | DONE |
Michael Hanson
|
|
|
02/26 #518 L1 ePlan. 1st review completed - See changemark in ePlan for corrections required.
|
Routing - PLAN CHECK | 2/27/2019 | | 3/1/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - Design Review | 2/27/2019 | | 3/1/2019 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/1/2019 | | DONE |
|
|
|
All Met (tyler@pnccontractors.com)
Need GC
Need rev cert of val
|
Route to Impact Fee Review | 2/27/2019 | 3/2/2019 | 2/27/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 2/27/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePlan for corrections required.
|
Routing - PLAN CHECK | 2/21/2019 | | 2/27/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePlan for corrections required.
|
Plan assigned to (JG) | 2/21/2019 | 2/21/2019 | 2/26/2019 | | DEFR |
Javier Guzman
|
|
|
2/26 L1 Jacksons Store 173 TI Remodel ePlan
|
Routing PW Environmental | 2/22/2019 | | 2/26/2019 | | PASS |
Terry Alber
|
|
|
No grease abatement required at this time.
|
Routing - Addressing | 2/21/2019 | | 2/22/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/21/2019 | | 2/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 2/21/2019 | | 2/21/2019 | | FAIL |
Andrea Tuning
|
|
|
The floor plan shows the infilling of an existing exterior door. This will require Design Review approval.
|
Routing - PLUMBING | 2/21/2019 | | 2/21/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Intake Approval | | | 2/20/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 1/29/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Plumbing plans required If food service, the plumbing plans shall be stamped and signed by an Idaho licensed engineer or provide and email from the plumbing supervisor Dan Ediger ###-#### stating no plumbing plans required
|
Application received | | | 1/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 28 2019 9:12AM
|