Permit Information
Permit NumberBLD19-00305
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2502 E WARM SPRINGS AVE
Project NameMitchel B
Customer NumberGATE CITY
ePlanReviewYes
Description
Permit for the construction of a new 2630 sq. ft., two story (first story 1246 sq. ft., second story 1384 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 166 sq. ft. of covered patio/porch and a 679 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. R-1C zoning and setbacks per planning. ***RDP*** NO SPRINKLERS REQUIRED. LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/24/20197/26/20197/26/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled7/26/20197/26/20197/26/2019PPASS
DetailsDave Hannah
BLD-Blower Door Test Results7/24/20197/26/20197/26/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall 4.7
BLD-Energy code compliance5/17/20195/22/20195/22/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in5/16/20195/20/20195/20/2019APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall ok to insulate but c/n on site
BLD-Wall Bracing5/2/20195/2/20195/2/2019PPASS
DetailsBrandon Shaw
Rudy Phone #: ###-####
BLD-Foundation3/28/20193/29/20193/29/2019APASS
DetailsBrandon Shaw
No change in location, footing and foundation are ok to pour, with no new Geo soil subgrade, per phone call with Melissa Jannusch
BLD-Footing3/26/20193/27/20193/27/2019APEND
DetailsDave Hannah
Ryan Phone #: ###-#### ok after new geo tech is aproved
BLD-Footing3/25/20193/26/20193/26/2019AFAIL
DetailsDave Hannah
Ryan Phone #: ###-#### needs a new geo tec on soil
BLD-Foundation3/1/20193/4/20193/4/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Conference2/22/20192/22/20192/22/2019PPASS
DetailsBrandon Shaw
Footing...
Work in progress...
PubWorks Subgrade Approval2/20/20192/20/20192/20/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
OVERRIDE  2/8/2019  
Plan assigned to (RDP)1/30/20191/30/20192/8/2019 DONE
DetailsRob Patrick
02/11 sfd L1 ePlan...2-6 1st done Failed; Need Beam Size
Issue PAID IN FULL permit  2/8/2019 DONE
Inspection Record Card- Bld  2/8/2019 DONE
Routing - PLAN CHECK2/8/2019 2/8/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/8/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  2/8/2019 DONE
met
Routing - PLAN CHECK1/30/2019 2/6/2019 FAIL
DetailsRob Patrick
Need Beam Size
1st review completed  2/6/2019 FAIL
DetailsRob Patrick
Routing - MECHANICAL1/30/2019 2/6/2019 PASS
DetailsTroy James
Route to Impact Fee Review1/30/20192/2/20191/31/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plan assigned to (BJM)1/30/20191/30/20191/30/2019 DEFR
DetailsBrian McGowan
02/11 sfd L1 ePlan
Routing - FIRE1/30/20191/30/20191/30/2019 PASS
DetailsLee G Meredith
No sprinklers requried.
Routing - PLANNING1/30/2019 1/30/2019 PASS
DetailsSue Cummings
Routing - Addressing1/30/2019 1/30/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS1/30/2019 1/30/2019 PASS
DetailsAngela Hardy
Application received  1/29/2019 DONE
Application submitted via PDS Online on Jan 29 2019 7:05AM
Plans ACCEPTED BY PLAN TECH  1/29/2019 DONE
Intake Approval  1/29/2019 PASS
Override - Parcel Holds  1/29/2019  
Recd Pcfee & Taken To Pln CK  1/29/2019 DONE