Permit Information
Permit NumberBLD19-00306
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 7564 W VICTORY RD
Project NameWurth Louis
Customer Number 
ePlanReviewYes
Description
(WURTH LOUIS - VICTORY BUILDING) The fire sprinkler system is used for building area increase and for fire area. Permit is to construct tenant improvements within a new 21,885 sq. ft. building shell (Shell under BLD17-00763) to make a 4,072 sq. ft. tenant space for office and warehouse use (1,231 sq. ft. office area + 2,741 sq. ft. warehouse area). Approval is contingent upon adhering to the approved plans on file and plan review report. Work to include: construction of interior non-bearing walls to make an open office area, a warehouse area and an accessible restroom, select new door/door frames, new suspended acoustic and gypsum ceiling, light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/23/2019 DONE
Print Statement  7/23/2019 DONE
First Notice 5/20/20197/10/2019 DONE
mailed 7-11
BLD-Final5/8/20195/10/20195/10/2019APASS
DetailsMike Jordan
Hello Mike
can you give me a heads up phone call 20 minutes prior to inspection? Phone #: ###-#### Inspection requested via web by Jim Carriveau. OK for perm occ.
FIRE-Final Inspection5/8/20195/10/20195/10/2019APASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  5/10/2019 DONE
BLD-Ceiling Grid Inspection5/2/20195/3/20195/3/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Nate Carriveau
Print Occupancy Form  5/2/2019 DONE
Plan Reviewer's activity  4/25/2019 DONE
04.25.2019-Recieved HMIS from Rick Bagley and cut sheets. Under MAQ. Attached HMIS in Tidemark.
Telephone call  4/24/2019 DONE
04.15.2019 Recieved email from Romeo regarding HMIS needed for storage in warehouse. Call has been made to Rick with Wurth Luis. 04/15-Said he would get a HMIS over. Called 4/18-was waiting on someone in SLC for list. Left message 04.23.2019. HMIS will be needed before fire final can be signed off.
BLD-Energy code compliance4/11/20194/11/20194/11/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Nate Carriveau
BLD-Framing/Rough-in4/4/20194/8/20194/8/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Nate Carriveau. Interior steel stud framed walls and hardkid ok.
Issue PAID IN FULL permit  3/13/2019 DONE
emailed jnorton@jwci.com.COM to sign the permit
Print Occupancy Form  3/13/2019 DONE
Plan assigned to (JG)2/8/20192/8/20193/8/2019 PASS
DetailsJavier Guzman
1st rev comp, 2/19 L2 Wurth Louis ePlan, pend fire
Plan Reviewer's activity  3/8/2019 DONE
DetailsBrian McGowan
I am reviewing the Plumbing fixture requirements for Javier since he is out sick.
Routing - PLAN CHECK3/8/2019 3/8/2019 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  3/8/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  3/8/2019 DONE
MET RYAN@LARSONARCHITECTS.BIZ
Need
GC form
Revised Value
Route to Impact Fee Review2/21/20192/24/20192/21/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - FIRE2/8/20192/8/20192/21/2019 PASS
DetailsMark Scharfen
IFC Fire Review 02.21.2019
1st review completed  2/21/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK2/8/2019 2/15/2019 FAIL
DetailsJavier Guzman
Routing - MECHANICAL2/8/2019 2/13/2019 PASS
DetailsTroy James
Routing PW Environmental2/8/2019 2/13/2019 PASS
DetailsRick Christenson
Routing - PLUMBING2/8/2019 2/8/2019 PASS
DetailsDaryl Spivey
Per p[lan and ISPC.
Routing - Addressing2/8/2019 2/8/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/8/2019 2/8/2019 PASS
DetailsMorgan Webb
Intake Approval  2/7/2019 PASS
DetailsJavier Guzman
Intake Approval  2/4/2019 FAIL
DetailsBrian McGowan
Please remove the PRELIMINARY note from the Architect's stamp and signature on Sheets 0, A-1, A-2 and A-3.
Application received  1/29/2019 DONE
Application submitted via PDS Online on Jan 29 2019 8:37AM
Intake Approval  1/29/2019 FAIL
DetailsBrian McGowan
Sheet M-1 has been crashing our ePlan on my end. Would you please resubmit that drawing using the exact same name in order to version over the sheet that is causing issues.
I will be able to finish the prescreen then.
Thank you,
Brian McGowan