BLD-Final | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/15/2019 | 8/15/2019 | 8/15/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.59
|
PubWorks Occupancy Approval | 8/15/2019 | 8/15/2019 | 8/15/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 5/9/2019 | 5/10/2019 | 5/10/2019 | A | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Jim Storey
|
|
|
Les Phone #: ###-####
|
BLD-Other | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Sofit-Les Phone #: ###-####
|
BLD-Wall Bracing | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Foundation | 3/15/2019 | 3/15/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
wall // Dion Phone #: ###-####
|
BLD-Conference | 3/12/2019 | 3/13/2019 | 3/13/2019 | P | PART |
Jim Sly
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Footing inspection. Ground and Rebar ....OK. No stringlines pulled at property lines. unable to verify setbacks. Pour at own risk.
|
PubWorks Subgrade Approval | 3/6/2019 | 3/6/2019 | 3/6/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/22/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/22/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/12/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 2/1/2019 | 2/1/2019 | 2/12/2019 | | DONE |
Rob Patrick
|
|
|
02/20 sfd L2 ePlan...2-11 Failed; Corrections Required
|
Routing - PLAN CHECK | 2/12/2019 | | 2/12/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/12/2019 | | DONE |
|
|
|
|
1st review completed | | | 2/11/2019 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 2/1/2019 | | 2/11/2019 | | FAIL |
Rob Patrick
|
|
|
|
Route to Impact Fee Review | 2/1/2019 | 2/4/2019 | 2/4/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 2/1/2019 | 2/1/2019 | 2/1/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are required and being provided, as noted on cover sheet A0.0.
|
Routing PW Grading-Hillside | 2/1/2019 | | 2/1/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - MECHANICAL | 2/1/2019 | | 2/1/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 2/1/2019 | | 2/1/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 2/1/2019 | | 2/1/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 2/1/2019 | | 2/1/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 2/1/2019 | | 2/1/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills home, site prep inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 2/1/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/1/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/1/2019 | | DONE |
|
|
|
|
Intake Approval | | | 1/30/2019 | | FAIL |
|
|
|
No door shown or spec'd to guest suite.
|
Application received | | | 1/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2019 1:49PM
|