BLD-Aging Inspection | 7/15/2020 | 7/15/2020 | 7/17/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Aging Inspection | 7/14/2020 | 7/14/2020 | 7/15/2020 | | PEND |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PASS |
Jim Storey
|
|
|
Kent- please call for access 30 before Phone #: ###-#### walls ok to cover c/n made ok.
|
BLD-Framing/Rough-in | 2/3/2020 | 2/4/2020 | 2/4/2020 | P | FAIL |
Tell Riley
|
|
|
call ahead // Ken Phone #: ###-####//need fire sprinkler roug in completed//add backing for Accessibility//secure demising wall studs//provide wall assembly for 1 hr room at fire riser//
|
Telephone call | | | 2/4/2020 | | DONE |
|
|
|
marcus called to change address on permit to 3023 N cole rd.
|
BLD-Framing/Rough-in | 12/26/2019 | 12/26/2019 | 12/26/2019 | P | NR |
Tell Riley
|
|
|
metal stem wall // Kent Phone #: ###-####// Ken had questions on demising wall--plans show to underside of roof sheathing--wall stops at roof insulation--refered him to architect//some walls have been one sided--asked him to leave uncovered until all trades passed and framing is approved//
|
BLD-Framing/Rough-in | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PART |
Tell Riley
|
|
|
Call ahead 30 minutes - truss bracing // Kent Phone #: ###-####//engineering and engineers letter from site visit and approval onsite dated Nov 20, 2019 stamped and signed reviewed onsite//trusses ok per engineer//
|
BLD-Wall Bracing | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | CANC |
Tell Riley
|
|
|
call for keycode access // Kim Phone #: ###-####//CN still onsite--corrections have not been completed//updated engineering will be needed to reflect what has been completed onsite--see correction notice//no wall bracing inspection needed at this time//
|
BLD-Framing/Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | FAIL |
Tell Riley
|
|
|
Call for access //
ken Phone #: ###-#### //CN posted--truss fixes to dont reflect engineering--see CN//
|
CHANGE STATUS TO (ISS) | | | 11/6/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JHB) | 9/30/2019 | 9/30/2019 | 10/2/2019 | | PASS |
Joe Bruce
|
|
|
10/07 (plan mod) Korean BBQ
|
Routing - PLAN CHECK | 10/2/2019 | | 10/2/2019 | | PASS |
Joe Bruce
|
|
|
Plan Modification passed. - Truss modification to accomodate fire sprinklers.
|
Permit Ready to Issue | | | 10/2/2019 | | DONE |
|
|
|
plan mod accepted
|
Plan Modification Accepted | | | 9/30/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 3/14/2019 | 3/14/2019 | 5/22/2019 | | PASS |
Joe Bruce
|
|
|
* 04/26 (4th Rev) 03/13 - (L3) Ombu 3 Korean BBQ (Bldg, DR, Mech, Fire)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/22/2019 | | DONE |
|
|
|
MET gwalker@adpboise.com
Need
ACHD
GC form
Revised certificate of value
|
Routing - FIRE | 4/22/2019 | 4/22/2019 | 5/20/2019 | | PASS |
Mark Scharfen
|
|
|
04/29 OMBU MS Resubmittal-sprinkler agreement recorded. Permit approved.
|
Routing - MECHANICAL | 4/22/2019 | | 4/23/2019 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 4/22/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 4/3/2019 | 4/3/2019 | 4/8/2019 | | FAIL |
Mark Scharfen
|
|
|
04/08-The sprinkler upgrade agreement has not been submitted and approved yet. Resubmit plans when upgrade agreement plan has been submitted and approved.
|
Routing - MECHANICAL | 4/3/2019 | | 4/8/2019 | | FAIL |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 4/8/2019 | | DONE |
Joe Bruce
|
|
|
Still need upgrade agreement letter for fire sprinklers in the adjacent building.
|
Plan resubmittals requested | | | 4/8/2019 | | DONE |
Joe Bruce
|
|
|
Sent email to Glenn regarding additional items required for resubmittal. **JHB**
|
Routing - PLAN CHECK | 4/3/2019 | | 4/8/2019 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 4/3/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 4/3/2019 | | 4/3/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - FIRE | 3/25/2019 | 3/25/2019 | 4/1/2019 | | FAIL |
Mark Scharfen
|
|
|
04/01 Waiting on sprinkler agreement before issuing permit. Resubmittal required.
|
Plan resubmittals requested | | | 4/1/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 3/25/2019 | | 3/28/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing - MECHANICAL | 3/25/2019 | | 3/26/2019 | | FAIL |
Troy James
|
|
|
Previous corrections have not been addressed.
|
Routing - PLANNING | 3/25/2019 | | 3/25/2019 | | PASS |
David Moser
|
|
|
|
Routing - Design Review | 3/25/2019 | | 3/25/2019 | | FAIL |
Katelyn Menuge
|
|
|
Provide height of new rooftop equipment vs height of existing parapet to demonstrate new equipment will be screened from view, or provide additional screening.
|
Plan resubmittals received | | | 3/25/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 3/14/2019 | 3/17/2019 | 3/15/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JAR) | 2/19/2019 | 2/19/2019 | 3/14/2019 | | DEFR |
Julie Romig
|
|
|
03/13 - L3 Ombu 3 Korean BBQ
|
Routing - FIRE | 2/19/2019 | 2/19/2019 | 3/14/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC final review 03.14.2019.pdf.
|
Routing - Design Review | 2/20/2019 | | 3/14/2019 | | FAIL |
Katelyn Menuge
|
|
|
Please add new rooftop mechanical equipment and any other exterior changes to one of your open DR applications and obtain approval prior to building permit submittal.
|
1st review completed | | | 3/14/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 3/14/2019 | | DONE |
Joe Bruce
|
|
|
Emailed plan review report to architect.
|
Routing - PLAN CHECK | 2/19/2019 | | 3/13/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - MECHANICAL | 2/19/2019 | | 2/26/2019 | | FAIL |
Troy James
|
|
|
See eplan for corrections
|
Routing - Erosion and Sediment | 2/19/2019 | | 2/26/2019 | | PASS |
Michael Zawacki
|
|
|
TI, no esc plan required.
|
Routing PW Environmental | 2/20/2019 | | 2/26/2019 | | PASS |
Terry Alber
|
|
|
Grease abatement approved.
|
Routing PW Solid Waste | 2/20/2019 | | 2/25/2019 | | PASS |
Evan Carpenter
|
|
|
|
Plan Reviewer's activity | | | 2/25/2019 | | DONE |
|
|
|
Spoke with architect, Glenn Walker, regarding proximity of Sockeye Restaurant building to the east at 3019 N Cole. Both buildings were considered one building for building area and there is no separation between the two. The owner plans to build out this west building, 3021 N Cole, and fire sprinkler it, then will add fire sprinklers to the east bldg. Both buildings will be reclassified as Type VB construction. Told Glenn that anupgrade agreement will be required.
|
Routing - PLUMBING | 2/19/2019 | | 2/20/2019 | | PASS |
Daryl Spivey
|
|
|
Vent floor drains as required and provide tempered water to lavs per ISPC 407.3.
|
Routing - PLANNING | 2/19/2019 | | 2/20/2019 | | FAIL |
Katelyn Menuge
|
|
|
Please add new rooftop mechanical equipment and any other exterior changes to one of your open DR applications and obtain approval prior to building permit submittal.
|
Routing - Addressing | 2/19/2019 | | 2/20/2019 | | PASS |
Doug Chausow
|
|
|
Suite 110
|
Routing - PUBLIC WORKS | 2/19/2019 | | 2/20/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 2/14/2019 | | PASS |
|
|
|
|
Intake Approval | | | 1/31/2019 | | FAIL |
Joe Bruce
|
|
|
1) Exit signs could not be located on sheet A1.20 as noted on the checklist.
2) COMcheck reports are required to be printed on the plans per the checklist. Upload additional plans with COMcheck reports that are stamped and signed by design professional.
3) Either provide and Erosion and Sediment Control waiver request or provide Erosion and Sediment Control Plans & Narrative for the installation of the grease interceptor in the parking lot. Contact Andy Long ###-#### AJLong@cityofboise.org
4) Provide structural drawings in addition to the submitted structural calculations that reflect the scope of work defined in the calculations. These drawings must be stamped/signed by the structural engineer.
5) Provide approved health department plans and application that shows the Central District Health approval stamp and signature. Upload these documents into the documents folder.
6) Sheet index on the cover page does not include sheet P-1.01. Revise sheet index to include all sheets included in the plans set.
7) Provide a demolition plan.
8) Incorrect codes are noted on the cover sheet for the Mechanical Code and Fuel/Gas Code. See currently adopted codes on our website: https://pds.cityofboise.org/media/1951/currently-adopted-building-codes-12-27-17.pdf
9) Since fire sprinklers are to be installed, provide location of fire sprinkler riser room and fire riser location on the plans.
|
Application received | | | 1/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2019 2:43PM
|