Plan Modification Accepted | | | 8/5/2020 | | DONE |
|
|
|
from Amber Lawless for Fort Builder: plan mod to add a trellis to front of existing building. Sheets: S1.0, S2.0, S3.0
|
BLD-Conference | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PART |
Tony Young
|
|
|
Screened-Charles Phone #: ###-####// ?s on finals
|
BLD-Aging Inspection | 4/30/2020 | 4/30/2020 | 5/4/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/29/2020 | 4/29/2020 | 4/30/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | NR |
Tell Riley
|
|
|
Charles- need to cover Phone #: ###-####//need mechanical rough in inspection for vents and added system in bathroom areas//ok to insulate rafters once complete//
|
BLD-Energy code compliance | 12/16/2019 | 12/17/2019 | 12/17/2019 | P | PART |
Tell Riley
|
|
|
Greyson Phone #: ###-####//front wall and side walls in front area ok//still will need to insulate bathroom areas//
|
BLD-Framing/Rough-in | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | PASS |
Tony Young
|
|
|
Greyson Phone #: ###-####,, front area ok
|
BLD-Energy code compliance | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PART |
Tony Young
|
|
|
Charle Phone #: ###-####,, north areas ok to cover
|
BLD-Framing/Rough-in | 12/11/2019 | 12/12/2019 | 12/12/2019 | P | PART |
Tony Young
|
|
|
Charle Phone #: ###-####// NORTH AREA WALLS OK to insulate
|
BLD-Conference | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | PART |
Tony Young
|
|
|
Amber Phone #: ###-####,, ok to cover floor area in the north east corner
|
BLD-Conference | 11/19/2019 | 11/20/2019 | 11/20/2019 | A | PART |
Tony Young
|
|
|
Charles Phone #: ###-####,, walk through job,, various ?s,, ok
|
Issue PAID IN FULL permit | | | 6/26/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/26/2019 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2019 | | DONE |
|
|
|
Emailed permits to be signed to- amber@fort-builders.com NOTE- Eplan will need to be release.
|
Telephone call | | | 6/20/2019 | | DONE |
|
|
|
METFees due were emailed to amber@fort-builders.com, she was informed that RP is needed and given information about Erosion
|
Telephone call | | | 6/19/2019 | | DONE |
|
|
|
METCall out to Amber but inbox was full and cannot leave message, therefore emailed amber@fort-builder.com to inform her that we need the GC and Revised Cert of Value and RP so that we can apply the remaining fees
|
OVERRIDE | | | 6/18/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 6/18/2019 | | DONE |
|
|
|
ALL MET-
RP for ESC
GC
Revised Certificate of Value
|
Plan assigned to (JAR) | 3/6/2019 | 3/6/2019 | 6/17/2019 | | DONE |
Julie Romig
|
|
|
06/18 - 4th Rev - 1st Rev Comp - L3 Fort Builder
|
Routing - PLAN CHECK | 6/12/2019 | | 6/17/2019 | | PASS |
Julie Romig
|
|
|
No structural review required - trellis removed from scope of work of this permit. Separate permit is required for trellis structure.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2019 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/12/2019 | | 6/17/2019 | | CANC |
Julie Romig
|
|
|
No structural review required - Trellis removed from project scope of work for this permit. Separate permit required for trellis.
|
Routing - Design Review | 6/12/2019 | | 6/12/2019 | | PASS |
Katelyn Menuge
|
|
|
Trellis Removal Okay
|
Routing Off Site - STRUCTURAL | 5/21/2019 | | 6/3/2019 | | FAIL |
Julie Romig
|
|
|
AHJ - 1st Review for Trellis
|
Routing - PLAN CHECK | 5/21/2019 | | 6/3/2019 | | PASS |
Julie Romig
|
|
|
3rd Review
|
Routing - PLANNING | 5/21/2019 | | 5/28/2019 | | PASS |
David Moser
|
|
|
|
Routing - Design Review | 5/21/2019 | | 5/28/2019 | | PASS |
Katelyn Menuge
|
|
|
Redlined Landscape Plan - Need to get landscape strip materials approved prior to occupancy.
|
Routing - FIRE | 4/29/2019 | 4/29/2019 | 4/29/2019 | | PASS |
Mark Scharfen
|
|
|
04.29.2019 uploaded revised letter. Passed fire review.
|
Routing - PLAN CHECK | 4/18/2019 | | 4/26/2019 | | FAIL |
Julie Romig
|
|
|
Plan review report emailed to applicant.
|
Routing - FIRE | 4/18/2019 | 4/18/2019 | 4/23/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC review 04.23.2019.pdf uploaded and emailed to architect.
|
Routing - PLANNING | 4/18/2019 | | 4/22/2019 | | FAIL |
David Moser
|
|
|
The front landscape buffer width is not cocnsistent with DA site plan
|
Routing - Design Review | 4/18/2019 | | 4/19/2019 | | FAIL |
Katelyn Menuge
|
|
|
Need to upload a landscape plan, showing all existing and proposed plantings and groundcover materials.
|
Route to Impact Fee Review | 3/28/2019 | 3/31/2019 | 3/29/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 3/6/2019 | 3/6/2019 | 3/28/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC 1st review 03.28.2019.pdf uploaded and emailed to architecht.
|
1st review completed | | | 3/28/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 3/6/2019 | | 3/28/2019 | | FAIL |
Julie Romig
|
|
|
|
Routing - Erosion and Sediment | 3/6/2019 | | 3/7/2019 | | PASS |
Michael Zawacki
|
|
|
Follow provided ESC plan
|
Routing - Design Review | 3/6/2019 | | 3/6/2019 | | FAIL |
Katelyn Menuge
|
|
|
Please provide compliant parking dimensions, a landscape plan, bicycle rack specifications, an 8-foot wide parkway strip, a 5-foot-wide pathway from the rear deck and show that the areas of vehicular use will be paved.
|
Routing - PUBLIC WORKS | 3/6/2019 | | 3/6/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLANNING | 3/6/2019 | | 3/6/2019 | | FAIL |
David Moser
|
|
|
need to pave the parking lot, provide 22 feet of backup space and 8 foot wide landscape buffer next to detached sidewalk.
|
Routing - Addressing | 3/6/2019 | | 3/6/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 3/1/2019 | | PASS |
|
|
|
|
Intake Approval | | | 2/28/2019 | | FAIL |
Joe Bruce
|
|
|
No structural design provided... Per checklist Provide structural design plans and calculations for the new covered patio stamped and signed by an Idaho licensed engineer. This scope of work cannot be done as a deferred design/build submittal. However this patio cover could be removed entirely from the set of plans and submitted to the building department at a later date.
|
Intake Approval | | | 2/21/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• The uploaded Lighting ComCheck is based on the 2012 IECC and the City of Boise is currently using the 2015 IECC, revise and upload a new ComCheck based on the 2015 IBC
• The uploaded Fire flow request form in not the letter from suez the checklist is requesting, provide the fire flow letter from suez
• Per the checklist all the plan sheets shall be Architectural stamped and signed by an Idaho licensed architect
• Per checklist Provide a door schedule that has the height of the new doors and type of hardware to be placed on the new doors
• Per checklist Provide a finish schedule for the walls, floors, ceiling, wall base, etc..
• Per checklist Provide structural design plans and calculations for the new covered patio stamped and signed by an Idaho licensed engineer
• Per checklist Provide mechanical details of the new range and range hood shown on the floor plan at the kitchen area
|
Intake Approval | | | 2/15/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following:
• Provide a completed 520 checklist found at https://pds.cityofboise.org/media/103678/520-major-ti-submittal-checklist_7-6-16.pdf
• If there are any items requested from the checklist 520 that did not get uploaded, please provide
• The plan sheets were uploaded as a packet and are required to be uploaded individually and named per ePlan submittal standards which can be found at https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
• Reserve the bottom right corner for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block per ePlan submittal standards.
|
Application received | | | 2/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 4 2019 3:24PM
|
Plan assigned to (JAR) | 8/5/2020 | 8/5/2020 | | | |
Julie Romig
|
|
|
plan mod
|