Permit Information
Permit NumberBLD19-00361
StatusUnder Review
Name FORT BUILDER LLC
Site Address 5304 W STATE ST
Project NameFort Builder
Customer Number 
ePlanReviewYes
Description
(FORT BUILDER) Permit for tenant improvements to an 1,543 sq ft existing building for a new co-working office space. Work to include: paving parking lot and related site work; new exterior 264 sq ft wood deck; new exterior sidingreplacing existing doors and windows with new; new interior non-bearing partition walls; two new accessible single-user restrooms; new accessible break room kitchen; new ceiling, lighting and exhaust fans in restrooms; and new interior finishes in compliance with Ch. 8 of the 2015 IBC. New lighting and switching to comply with the 2015 IECC. Exterior walls/ceiling to be filled with insulation where cavities are exposed during construction. Separate permit required for future construction of exterior trellis structure. This building is NOT fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Modification Accepted  8/5/2020 DONE
from Amber Lawless for Fort Builder: plan mod to add a trellis to front of existing building. Sheets: S1.0, S2.0, S3.0
BLD-Conference6/15/20206/16/20206/16/2020APART
DetailsTony Young
Screened-Charles Phone #: ###-####// ?s on finals
BLD-Aging Inspection4/30/20204/30/20205/4/2020 PEND
DetailsTony Young
BLD-Aging Inspection4/29/20204/29/20204/30/2020 PEND
DetailsTony Young
BLD-Other1/21/20201/21/20201/21/2020PNR
DetailsTell Riley
Charles- need to cover Phone #: ###-####//need mechanical rough in inspection for vents and added system in bathroom areas//ok to insulate rafters once complete//
BLD-Energy code compliance12/16/201912/17/201912/17/2019PPART
DetailsTell Riley
Greyson Phone #: ###-####//front wall and side walls in front area ok//still will need to insulate bathroom areas//
BLD-Framing/Rough-in12/16/201912/17/201912/17/2019APASS
DetailsTony Young
Greyson Phone #: ###-####,, front area ok
BLD-Energy code compliance12/12/201912/13/201912/13/2019APART
DetailsTony Young
Charle Phone #: ###-####,, north areas ok to cover
BLD-Framing/Rough-in12/11/201912/12/201912/12/2019PPART
DetailsTony Young
Charle Phone #: ###-####// NORTH AREA WALLS OK to insulate
BLD-Conference11/25/201911/25/201911/25/2019PPART
DetailsTony Young
Amber Phone #: ###-####,, ok to cover floor area in the north east corner
BLD-Conference11/19/201911/20/201911/20/2019APART
DetailsTony Young
Charles Phone #: ###-####,, walk through job,, various ?s,, ok
Issue PAID IN FULL permit  6/26/2019 DONE
Print Occupancy Form  6/26/2019 DONE
Telephone call  6/26/2019 DONE
Emailed permits to be signed to- amber@fort-builders.com NOTE- Eplan will need to be release.
Telephone call  6/20/2019 DONE
METFees due were emailed to amber@fort-builders.com, she was informed that RP is needed and given information about Erosion
Telephone call  6/19/2019 DONE
METCall out to Amber but inbox was full and cannot leave message, therefore emailed amber@fort-builder.com to inform her that we need the GC and Revised Cert of Value and RP so that we can apply the remaining fees
OVERRIDE  6/18/2019  
Permit Ready to Issue  6/18/2019 DONE
ALL MET-
RP for ESC
GC
Revised Certificate of Value
Plan assigned to (JAR)3/6/20193/6/20196/17/2019 DONE
DetailsJulie Romig
06/18 - 4th Rev - 1st Rev Comp - L3 Fort Builder
Routing - PLAN CHECK6/12/2019 6/17/2019 PASS
DetailsJulie Romig
No structural review required - trellis removed from scope of work of this permit. Separate permit is required for trellis structure.
PLANS/APPL TAKEN TO FRONT DESK  6/17/2019 DONE
Routing Off Site - STRUCTURAL6/12/2019 6/17/2019 CANC
DetailsJulie Romig
No structural review required - Trellis removed from project scope of work for this permit. Separate permit required for trellis.
Routing - Design Review6/12/2019 6/12/2019 PASS
DetailsKatelyn Menuge
Trellis Removal Okay
Routing Off Site - STRUCTURAL5/21/2019 6/3/2019 FAIL
DetailsJulie Romig
AHJ - 1st Review for Trellis
Routing - PLAN CHECK5/21/2019 6/3/2019 PASS
DetailsJulie Romig
3rd Review
Routing - PLANNING5/21/2019 5/28/2019 PASS
DetailsDavid Moser
Routing - Design Review5/21/2019 5/28/2019 PASS
DetailsKatelyn Menuge
Redlined Landscape Plan - Need to get landscape strip materials approved prior to occupancy.
Routing - FIRE4/29/20194/29/20194/29/2019 PASS
DetailsMark Scharfen
04.29.2019 uploaded revised letter. Passed fire review.
Routing - PLAN CHECK4/18/2019 4/26/2019 FAIL
DetailsJulie Romig
Plan review report emailed to applicant.
Routing - FIRE4/18/20194/18/20194/23/2019 FAIL
DetailsMark Scharfen
IFC review 04.23.2019.pdf uploaded and emailed to architect.
Routing - PLANNING4/18/2019 4/22/2019 FAIL
DetailsDavid Moser
The front landscape buffer width is not cocnsistent with DA site plan
Routing - Design Review4/18/2019 4/19/2019 FAIL
DetailsKatelyn Menuge
Need to upload a landscape plan, showing all existing and proposed plantings and groundcover materials.
Route to Impact Fee Review3/28/20193/31/20193/29/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE3/6/20193/6/20193/28/2019 FAIL
DetailsMark Scharfen
IFC 1st review 03.28.2019.pdf uploaded and emailed to architecht.
1st review completed  3/28/2019 FAIL
DetailsJulie Romig
Routing - PLAN CHECK3/6/2019 3/28/2019 FAIL
DetailsJulie Romig
Routing - Erosion and Sediment3/6/2019 3/7/2019 PASS
DetailsMichael Zawacki
Follow provided ESC plan
Routing - Design Review3/6/2019 3/6/2019 FAIL
DetailsKatelyn Menuge
Please provide compliant parking dimensions, a landscape plan, bicycle rack specifications, an 8-foot wide parkway strip, a 5-foot-wide pathway from the rear deck and show that the areas of vehicular use will be paved.
Routing - PUBLIC WORKS3/6/2019 3/6/2019 PASS
DetailsMorgan Webb
Routing - PLANNING3/6/2019 3/6/2019 FAIL
DetailsDavid Moser
need to pave the parking lot, provide 22 feet of backup space and 8 foot wide landscape buffer next to detached sidewalk.
Routing - Addressing3/6/2019 3/6/2019 PASS
DetailsDoug Chausow
Intake Approval  3/1/2019 PASS
Intake Approval  2/28/2019 FAIL
DetailsJoe Bruce
No structural design provided... Per checklist Provide structural design plans and calculations for the new covered patio stamped and signed by an Idaho licensed engineer. This scope of work cannot be done as a deferred design/build submittal. However this patio cover could be removed entirely from the set of plans and submitted to the building department at a later date.
Intake Approval  2/21/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• The uploaded Lighting ComCheck is based on the 2012 IECC and the City of Boise is currently using the 2015 IECC, revise and upload a new ComCheck based on the 2015 IBC
• The uploaded Fire flow request form in not the letter from suez the checklist is requesting, provide the fire flow letter from suez
• Per the checklist all the plan sheets shall be Architectural stamped and signed by an Idaho licensed architect
• Per checklist Provide a door schedule that has the height of the new doors and type of hardware to be placed on the new doors
• Per checklist Provide a finish schedule for the walls, floors, ceiling, wall base, etc..
• Per checklist Provide structural design plans and calculations for the new covered patio stamped and signed by an Idaho licensed engineer
• Per checklist Provide mechanical details of the new range and range hood shown on the floor plan at the kitchen area
Intake Approval  2/15/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
• Provide a completed 520 checklist found at https://pds.cityofboise.org/media/103678/520-major-ti-submittal-checklist_7-6-16.pdf
• If there are any items requested from the checklist 520 that did not get uploaded, please provide
• The plan sheets were uploaded as a packet and are required to be uploaded individually and named per ePlan submittal standards which can be found at https://pds.cityofboise.org/media/464072/pdox86_electronic_standards_full_050718.pdf
• Reserve the bottom right corner for City approval stamps. Leave a blank 4” x 4” space located 3” off the right sheet edge to allow for the title block per ePlan submittal standards.
Application received  2/4/2019 DONE
Application submitted via PDS Online on Feb 4 2019 3:24PM
Plan assigned to (JAR)8/5/20208/5/2020   
DetailsJulie Romig
plan mod