Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-00368
StatusFinaled
Name BRAZOS CONTRACTORS AND DEVELOPMENT
Site Address 8275 W OVERLAND RD
Project NameStarbucks Coffee - Remodel
Customer Number 
ePlanReviewYes
Description
(STARBUCKS COFFEE – INTERIOR REMODEL) This building does not have a fire sprinkler system. To remodel the interior of an existing 1,630 square foot restaurant. Work is to include interior nonbearing walls, trenches to accommodate under slab plumbing, concrete slab patches, kitchen equipment, millwork, and finishes. The two existing single-user toilet rooms are required to be maintained accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/24/20197/10/2019 DONE
mailed 7-11
BLD-Final5/13/20195/14/20195/14/2019PPASS
DetailsMike Jordan
Rick Phone #: ###-####
FIRE-Final Inspection5/13/20195/14/20195/14/2019APASS
DetailsTroy Cobbley
Life safety passed

Rick Phone #: ###-####
Permanent Occupancy  5/14/2019 DONE
BLD-Framing/Rough-in5/7/20195/8/20195/8/2019APASS
DetailsMike Jordan
Rick Phone #: ###-####. Inteior steel stud framed walls and soffit ok. Pending electrical and plumbing rough in inspections.
Issue PAID IN FULL permit  3/19/2019 DONE
Print Occupancy Form  3/19/2019 DONE
Print Occupancy Form  3/19/2019 DONE
Plan assigned to (CJW)2/20/20192/20/20193/18/2019 PASS
DetailsCarl Westfall
(1st done) 03/07/19 (L3 - 15 days) (ePlan - 36 sheets) Starbucks (routed back to applicant)
Plan resubmittals received  3/18/2019 DONE
Routing - PLAN CHECK3/18/2019 3/18/2019 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  3/18/2019 DONE
Permit Ready to Issue  3/18/2019 DONE
MET AMANDA.H@BRAZOSCONTRACTORS.COM
NEED
GC FORM
REVISED VALUE
Route to Impact Fee Review3/14/20193/17/20193/15/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE2/20/20192/20/20193/14/2019 PASS
DetailsMark Scharfen
IFC final review 03.14.2019.pdf
1st review completed  3/14/2019 DONE
Plan resubmittals requested  3/14/2019 DONE
Routing - PLAN CHECK2/20/2019 3/8/2019 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - Erosion and Sediment2/20/2019 2/26/2019 PASS
DetailsMichael Zawacki
Interior TI, no ESC review required.
Routing - MECHANICAL2/20/2019 2/25/2019 PASS
DetailsChad Schwendiman
Existing mechanical system shown to remain with no changes.
Routing - PLUMBING2/20/2019 2/20/2019 PASS
DetailsDaryl Spivey
See redline remarks and install per ISPC.
Routing - PLANNING2/20/2019 2/20/2019 PASS
DetailsSusan Riggs
Routing - Addressing2/20/2019 2/20/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/20/2019 2/20/2019 PASS
DetailsAngela Hardy
Intake Approval  2/15/2019 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. #304 form missing - COMPLETED
2. #518 missing sheet locations of items.
3. CDHD approval letter or stamped review missing. - COMPLETED
4. Update G-0001 scope of work per our email.
5. Provide energy code compliance for lighting. - COMPLETED
Intake Approval  2/15/2019 PASS
Application received  2/5/2019 DONE
Application submitted via PDS Online on Feb 5 2019 10:26AM
Intake Approval  2/5/2019 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. #304 form missing
2. #518 missing sheet locations of items.
3. CDHD approval letter or stamped review missing
4. Provide planning and zoning letters of approval.
5. Provide energy code compliance for lighting.