Permit Information
Permit NumberBLD19-00371
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5944 E HOOTOWL DR
Project NameSequoia Harris Ranch North #1
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **WUI FOOTHILLS ZONE A REQUIREMENTS** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3249 sq. ft., two story (first story 2048 sq. ft., second story 1201 sq. ft.) single family dwelling with 5 bedrooms, 4 bathrooms, approximately277 sq. ft. of covered patio/porch and a 937 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/14/20198/14/20198/14/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled8/14/20198/14/20198/14/2019PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval8/13/20198/13/20198/13/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Final8/9/20198/12/20198/12/2019ACANC
DetailsBrandon Shaw
Breckin and Melissa need sign off Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Blower Door Test Results8/12/20198/12/20198/12/2019PDONE
DetailsBrandon Shaw
ACH50- 4.45
BLD-Final8/7/20198/8/20198/8/2019PNR
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Energy code compliance5/17/20195/17/20195/17/2019PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in5/15/20195/16/20195/16/2019AFAIL
DetailsBrandon Shaw
Per plans- 4x8 headers needed, 2 locations...
Per plans- A35 at 12" o.c., see detail 2, pg. S1.1...
Strap needed at break in double top plate...
Fire blocking needed at flue chase, up stairs...
OK to insulate...
BLD-Other5/14/20195/15/20195/15/2019PPASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Wall Bracing4/24/20194/24/20194/24/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation3/22/20193/25/20193/25/2019APASS
DetailsBrandon Shaw
Worl in progress...
BLD-Footing3/21/20193/21/20193/21/2019APASS
DetailsBrandon Shaw
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
DOC - Permit Finaled3/21/20193/21/20193/21/2019PPASS
DetailsBrandon Shaw
PubWorks Subgrade Approval3/21/20193/21/20193/21/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. A footing inspection may now be scheduled with the Building Department.

CHANGE STATUS TO (ISS)  3/21/2019 DONE
per brandon should not be a final
BLD-Footing3/20/20193/20/20193/20/2019ANR
DetailsBrandon Shaw
Need soil subgrade submitted and approved by PW...
Issue & PRINT permit  3/8/2019 DONE
Inspection Record Card- Bld  3/8/2019 DONE
OVERRIDE  2/19/2019  
Plan assigned to (J_N)2/5/20192/5/20192/19/2019 DONE
DetailsJenny Nelson
02/22 sfd L2 ePlan. 1st complete 2/15, strucural calcs showing one garage beam doesn't pass need clarification.
Routing - PLAN CHECK2/19/2019 2/19/2019 PASS
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  2/19/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  2/19/2019 DONE
1st review completed  2/15/2019 FAIL
DetailsJenny Nelson
Routing - PLAN CHECK2/5/2019 2/15/2019 FAIL
DetailsJenny Nelson
Routing - MECHANICAL2/5/2019 2/7/2019 PASS
DetailsTroy James
Route to Impact Fee Review2/5/20192/8/20192/6/2019 PASS
DetailsKarina Myles
Initial residential review of new SFD permits requested for now.
Routing - FIRE2/5/20192/5/20192/6/2019 PASS
DetailsLee G Meredith
No sprinklers required.
Routing PW Grading-Hillside2/6/2019 2/6/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLANNING2/5/2019 2/6/2019 PASS
DetailsSue Cummings
Routing - Addressing2/5/2019 2/6/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/5/2019 2/6/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment2/5/2019 2/6/2019 PASS
DetailsMichael Zawacki
Foothills home, site prep inspection required.
Application received  2/5/2019 DONE
Application submitted via PDS Online on Feb 5 2019 11:20AM
Plans ACCEPTED BY PLAN TECH  2/5/2019 DONE
Intake Approval  2/5/2019 PASS
Recd Pcfee & Taken To Pln CK  2/5/2019 DONE