BLD-Final | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Tell Riley
|
|
|
jack Phone #: ###-####//final complete per approved plans//smoke and CO detectors added//
|
DOC - Permit Finaled | 2/7/2020 | 2/7/2020 | 2/7/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | FAIL |
Tell Riley
|
|
|
Joe Phone #: ###-####//need to add smoke and combo detectors to code//need city approved plans onsite//called contractor and let him know//
|
BLD-Aging Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 | | PASS |
Tell Riley
|
|
|
Expires: 12/14/19
|
BLD-Energy code compliance | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | PASS |
Tell Riley
|
|
|
Josh Phone #: ###-####//ok to cover framing//
|
BLD-Framing/Rough-in | 6/12/2019 | 6/12/2019 | 6/12/2019 | P | PASS |
Tell Riley
|
|
|
Framing ok per plans//call for energy
|
BLD-Energy code compliance | 6/11/2019 | 6/12/2019 | 6/12/2019 | P | NR |
Tell Riley
|
|
|
Josh Phone #: ###-####//needs Mechanical rough in inspection//call in for framing/rough-in inspection once mechanical has passed// left message on number provided.//
|
BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | CANC |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
BLD-Wall Bracing | 5/3/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Mike Jordan
|
|
|
Josh Phone #: ###-####
|
BLD-Foundation | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Jim Sly
|
|
|
Willy Phone #: ###-####
|
BLD-Footing | 3/12/2019 | 3/12/2019 | 3/13/2019 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
BLD-Footing | 3/11/2019 | 3/11/2019 | 3/12/2019 | P | NR |
Jim Sly
|
|
|
Willie Phone #: ###-#### Need approval from Public Works.
|
PubWorks Subgrade Approval | 3/12/2019 | 3/12/2019 | 3/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 3/1/2019 | | |
|
|
|
|
Telephone call | | | 3/1/2019 | | DONE |
|
|
|
spoke with Joe informing him this permit is ready and the fee amount due
|
Issue PAID IN FULL permit | | | 3/1/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/1/2019 | | DONE |
|
|
|
|
Plan assigned to (J_N) | 2/19/2019 | 2/19/2019 | 2/28/2019 | | DONE |
Jenny Nelson
|
|
|
02/25 addition L2
|
Routing - Erosion and Sediment | 2/28/2019 | | 2/28/2019 | | PASS |
Michael Zawacki
|
|
|
Waiver request approved.
|
Routing - PLAN CHECK | 2/25/2019 | | 2/28/2019 | | PASS |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 2/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 2/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - Addressing | 2/27/2019 | | 2/27/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing PW Grading-Hillside | 2/25/2019 | | 2/26/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Plan Reviewer's activity | | | 2/25/2019 | | DONE |
Josh Bogle
|
|
|
Routed plans per applicant request after Planning sign-off
|
Routing - PLANNING | 2/19/2019 | | 2/22/2019 | | PASS |
David Moser
|
|
|
See CAA19-00028
|
Routing Walk-In (BLD) | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | FAIL |
Jenny Nelson
|
|
|
Needs to wait for planning appeal period to finish on 2/22 before planning can sign off. Also missing a couple plans. Took in as level 2.
|
Routing Walk-In (BLD) | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/12/2019 | | 2/12/2019 | | FAIL |
Josh Bogle
|
|
|
plan lacked details
|
Routing Walk-In (Zoning) | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | FAIL |
Nicolette Womack
|
|
|
Administrative approval required for a residential use in the C2-D district.
|
Routing Walk-In (BLD) | 2/5/2019 | 2/5/2019 | 2/5/2019 | P | FAIL |
Michael Hanson
|
|
|
Will be back... Doesn't have framing sheet and will also provide section.
|
Routing PW Grading-Hillside | 2/5/2019 | | 2/5/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
1st review completed | | | 2/5/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/5/2019 | | | |
|
|
|
|