BLD-Final | 7/10/2020 | 7/13/2020 | 7/13/2020 | A | PASS |
Jim Storey
|
|
|
call 15 min before arrival. Meet B26 lobby Phone #: ###-#### Inspection requested via web by Daniel Cook
|
DOC - Permit Finaled | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | PASS |
Jim Storey
|
|
|
call ahead 15 minutes. Meet B26 lobby. Phone #: ###-#### Inspection requested via web by Daniel Cook shaft linner and ch studes ok to cover.
|
BLD-Final | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | CANC |
Jim Storey
|
|
|
meet in B26 lobby. thanks Phone #: ###-#### Inspection requested via web by Daniel Cook remove exterior membrane and call for insp.
|
FIRE-Final Inspection | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | CANC |
Jim Page
|
|
|
please call 1/2 before arrival. Meet in B26 lobby thanks Phone #: ###-#### >> Inspection requested via web by Daniel Cook Inspection cancelled from web by: Daniel Cook
|
FIRE-Final Inspection | 3/26/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work is complete, signature card not available at time of inspection.
|
BLD-Framing/Rough-in | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | CANC |
Jim Storey
|
|
|
Please call 1/2 hour before arrival. Meet in B26 lobby. Thanks Phone #: ###-#### Inspection requested via web by Daniel Cook dan canc via phone call.
|
Issue PAID IN FULL permit | | | 1/31/2020 | | DONE |
|
|
|
|
Meeting | | | 1/7/2020 | | DONE |
|
|
|
sent an email to paul suggesting to turn in a request for an extension if this permit is not going to be picked up soon (155 days past date)
|
Meeting | | | 12/2/2019 | | DONE |
|
|
|
sent an email to paul suggesting to turn in a request for an extension if this permit is not going to be picked up soon
|
Plan assigned to (CDM) | 11/19/2019 | 11/19/2019 | 11/19/2019 | | PASS |
Carl D Madsen
|
|
|
Micron B #50
|
Routing - PLAN CHECK | 11/19/2019 | | 11/19/2019 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 11/19/2019 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2019 | | DONE |
|
|
|
Need
GC Form
|
Intake Approval | | | 11/19/2019 | | PASS |
|
|
|
|
Intake Approval | | | 7/29/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing 518 checklist
2. Missing 304 form
3. Missing planning and zoning approval letter
4. Construction drawings must be monochrome. Color prints are not allowed.
5. Show location of the new HVAC units
6. Provide U.L or G.A. assembly number and detail.
7. Provide City of Boise stamping area at bottom right of construction drawings.
|
Application received | | | 2/5/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 5 2019 3:35PM
|