BLD-Final | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Jim Storey
|
|
|
Jason Phone #: ###-####
|
DOC - Permit Finaled | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | CANC |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Energy code compliance | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
BLD-Framing/Rough-in | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Jim Storey
|
|
|
Jason Phone #: ###-####
|
Inspection Record Card- Bld | | | 7/10/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/10/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/27/2019 | | |
|
|
|
|
BLD-Wall Bracing | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Jim Storey
|
|
|
Jason Phone #: ###-####
|
Plan assigned to (RDP) | 6/26/2019 | 6/26/2019 | 6/27/2019 | | DONE |
Rob Patrick
|
|
|
07/03 "PLAN MOD" sfd L1 PAPER...Gave 2 copies to Katelyn
|
Routing - PLANNING | 6/27/2019 | | 6/27/2019 | | PASS |
Katelyn Menuge
|
|
|
4-foot setbacks on each side okay
|
Plan Reviewer's activity | | | 6/27/2019 | | DONE |
|
|
|
Delivered both copies of Dite Plan to Katelyn for review
|
Routing - PLAN CHECK | 6/27/2019 | | 6/27/2019 | | PASS |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/27/2019 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
Telephone call | | | 6/27/2019 | | DONE |
|
|
|
Spoke with Jason to inform him the plan mod is approved and what fees are due.
|
Plan Modification Accepted | | | 6/26/2019 | | DONE |
|
|
|
site plan being modified. Sheet A1
|
BLD-Wall Bracing | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | FAIL |
Jim Storey
|
|
|
shear // Jason Phone #: ###-#### resubmit for change in lot location of building.
|
BLD-Footing | 4/11/2019 | 4/11/2019 | 4/11/2019 | P | PART |
Jim Storey
|
|
|
JR Phone #: ###-#### ft ok resubmit for change in lot location of building.
|
Issue PAID IN FULL permit | | | 4/3/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/5/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 2/13/2019 | 2/13/2019 | 3/5/2019 | | DONE |
Rob Patrick
|
|
|
02/19 sfd L1 PAPER...2/14 Failed; Needs to correct wall bracing.
|
Inspection Record Card- Bld | | | 3/5/2019 | | DONE |
|
|
|
|
Telephone call | | | 3/5/2019 | | DONE |
|
|
|
Left voicemail for Jason to inform him the permit is ready and what fees are due.
|
Routing - PLAN CHECK | 3/5/2019 | | 3/5/2019 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 3/5/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/5/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 3/5/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/28/2019 | | DONE |
|
|
|
Two copies of each S1, S2, S3.1 and S3.2 stamped and taken to plan reviewer
|
Routing - PLAN CHECK | 2/13/2019 | | 2/14/2019 | | FAIL |
Rob Patrick
|
|
|
Needs to correct wall bracing.
|
1st review completed | | | 2/14/2019 | | FAIL |
Rob Patrick
|
|
|
Needs to correct wall bracing.
|
Plan assigned to (M_H) | 2/6/2019 | | 2/13/2019 | | DEFR |
Michael Hanson
|
|
|
02/19 #402 L1 Paper
|
Routing - PLANNING | 2/6/2019 | | 2/13/2019 | | PASS |
Katelyn Menuge
|
|
|
Rear setback for garage must be minimum of 7-feet.
|
Routing - MECHANICAL | 2/8/2019 | | 2/12/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 2/6/2019 | | 2/8/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/6/2019 | | 2/8/2019 | | PASS |
Angela Hardy
|
|
|
|
Route to Impact Fee Review | 2/6/2019 | 2/9/2019 | 2/7/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Intake Approval | | | 2/6/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/6/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/6/2019 | | DONE |
|
|
|
|
Application received | | 2/6/2019 | | | |
|
|
|
|