First Notice | 3/9/2020 | 3/9/2020 | 4/3/2020 | | DONE |
Dave Hannah
|
|
|
mailed 4-6-2020
|
BLD-Final | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/4/2020 | 3/4/2020 | 3/9/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/3/2020 | 3/3/2020 | 3/9/2020 | | PEND |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 4/19/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2019 | | DONE |
|
|
|
|
Meeting | | | 3/20/2019 | | DONE |
|
|
|
per ben houpt the full value was places for this permit. he was informed there would need to be two different permits and the value should only be half. See letter/email in documents; see BLD19-00863
|
1st review completed | | | 3/19/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/19/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/19/2019 | | DONE |
|
|
|
all met
NEED
GC FORM
REVISED VALUE
|
Meeting | | | 3/19/2019 | | DONE |
|
|
|
spoke with Ben informing him we will need a letter (with his letter head) stating what the value should be and why. informed him the gc will need to turn in the 306 and 302
|
Plan assigned to (M_H) | 3/6/2019 | | 3/19/2019 | | DONE |
Michael Hanson
|
|
|
03/19 #518 L2 ePlan. Parking Garage Lighting
|
Routing - PLAN CHECK | 3/6/2019 | | 3/19/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing PW Street Lights | 3/7/2019 | | 3/8/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 3/6/2019 | | 3/7/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 3/6/2019 | | 3/7/2019 | | PASS |
Doug Chausow
|
|
|
Changed Main Blvd to Main St
|
Intake Approval | | | 3/6/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by Michael Hanson
|
Intake Approval | | | 3/1/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Construction documents must be individually uploaded. THERE ARE 8 SHEETS IN THE SET, THOSE 8 SHEETS MUST BE INDIVIDUALLY UPLOADED.
2. Provide #518 checklist completed and signed. COMPLETED
3. Provide #304 form completed and signed. COMPLETED
|
Intake Approval | | | 2/20/2019 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Construction documents must be individually uploaded.
2. Provide #518 checklist completed and signed.
3. Provide #304 form completed and signed.
|
Application received | | | 2/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 6 2019 3:31PM
|