BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Jim Storey
|
|
|
Scott Phone #: ###-####
|
DOC - Permit Finaled | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 11/7/2019 | 11/7/2019 | 11/7/2019 | | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Jim Storey
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Jim Storey
|
|
|
Scott Phone #: ###-####
|
BLD-Wall Bracing | 5/14/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Jim Storey
|
|
|
Scott Phone #: ###-####
|
BLD-Conference | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Jim Storey
|
|
|
TONY- Please call 1st arriving Phone #: ###-####
|
BLD-Foundation | 4/14/2019 | 4/15/2019 | 4/15/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | NR |
Jim Storey
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru no pw signoff
|
PubWorks Subgrade Approval | 4/4/2019 | 4/4/2019 | 4/4/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 4/3/2019 | 4/4/2019 | 4/3/2019 | P | CANC |
Jim Storey
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru Inspection cancelled via mobile web on Wednesday, April 03, 2019.
|
BLD-Footing | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | FAIL |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by Pw... Special Inspection is required for post concrete anchors...
|
BLD-Footing | 3/20/2019 | 3/21/2019 | 3/21/2019 | P | NR |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron aggregate construct need pw
|
OVERRIDE | | | 3/11/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 3/11/2019 | 3/11/2019 | 3/11/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/11/2019 | | 3/11/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/11/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/11/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 3/11/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 3/11/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 3/11/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 3/1/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/7/2019 | 2/7/2019 | 3/1/2019 | | PASS |
Josh Bogle
|
|
|
2/13 Hillside addition, paper - 1st done
|
Plan Reviewer's activity | | | 3/1/2019 | | DONE |
Josh Bogle
|
|
|
phone call and e-mail with engineer
|
Routing - PLAN CHECK | 3/1/2019 | | 3/1/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/1/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/1/2019 | | DONE |
|
|
|
|
Telephone call | | | 3/1/2019 | | DONE |
|
|
|
Left a message for scott informing permit is ready and the fee amount due
|
Issue PAID IN FULL permit | | | 3/1/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 2/28/2019 | 2/28/2019 | 2/28/2019 | A | FAIL |
Josh Bogle
|
|
|
plans not changed to match engineering
|
Plan resubmittals requested | | | 2/28/2019 | | DONE |
|
|
|
Resubmittals recieved 1 set of calcs & a statement of special insp-sent to JAB
|
Routing Walk-In (BLD) | 2/21/2019 | 2/21/2019 | 2/21/2019 | A | FAIL |
Josh Bogle
|
|
|
concerns about point load and lateral on the tall wall
|
CHANGE STATUS TO (REV) | | | 2/21/2019 | | DONE |
|
|
|
Permit was put in fee status by accident
|
Plan resubmittals received | | | 2/21/2019 | | DONE |
|
|
|
One copy of Tall wall calcualations, and two sets of full plans stamped and taken to JAB
|
Routing - PLAN CHECK | 2/7/2019 | | 2/11/2019 | | FAIL |
Josh Bogle
|
|
|
missing headers, footers, shear - see e-mail to Scott Tutt 2.11.19
|
1st review completed | | | 2/11/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 2/7/2019 | | 2/8/2019 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 2/8/2019 | | 2/8/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver request approved. GC's RP license isexpired. Need to get recert or homeowner RP.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 2/7/2019 | | 2/7/2019 | | PASS |
Melissa Jannusch
|
|
|
CAT I hillside permit.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PUBLIC WORKS | 2/7/2019 | | 2/7/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLANNING | 2/7/2019 | | 2/7/2019 | | PASS |
Andrea Tuning
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/7/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/7/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2019 | | DONE |
|
|
|
|
Application received | | 2/7/2019 | | | |
|
|
|
|