Extend Permit 90/180 days | | 9/26/2019 | 9/26/2019 | | DONE |
|
|
|
first request for permit extension granted: Per Joe Bruce
|
Change Expiration Date Only | | | 9/26/2019 | | DONE |
|
|
|
first permit extension granted by Joe Bruce. Extended 180 days
|
Issue PAID IN FULL permit | | | 9/26/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/26/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2019 | | DONE |
|
|
|
|
Telephone call | | | 9/25/2019 | | DONE |
|
|
|
talked to Ariel with Chipman Design-the audit fees are correct. the inital fees were wrong
|
Meeting | | | 9/24/2019 | | DONE |
|
|
|
request for an extension was sent in
|
Telephone call | | | 9/20/2019 | | DONE |
|
|
|
left a message for anna recommending a extension request be sent in if this permit is not going to be paid for and picked up by the end of next week (8-23-19)
|
Plan assigned to (BJM) | 8/31/2019 | 8/31/2019 | 9/18/2019 | | DONE |
Brian McGowan
|
|
|
09/12-Finish in Time frame- L2 Noodles & Co. ePlan
|
1st review completed | | | 9/18/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/18/2019 | | DONE |
|
|
|
all met 9-26-19 CAN Need GC-met
Need rev cert of val-i scanned and put rev cert of val in the docs BUT am waiting for the mechanical valuations-Ariel Romero is going to find out and have ESI redo the form so we can put htem in Tidemark
emailed aromero@chipman-design.com
|
Routing - PLAN CHECK | 8/31/2019 | | 9/18/2019 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 8/31/2019 | | 9/5/2019 | | PASS |
Karla Nelson
|
|
|
|
Routing - Addressing | 8/31/2019 | | 9/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/31/2019 | | 9/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Design Review | 8/31/2019 | | 9/3/2019 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 8/30/2019 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/26/2019 | | DONE |
Julie Romig
|
|
|
Should have been a 518 minor tenant improvement. No change to occupant load or occupancy, existing restaurant tenant.
|
Intake Approval | | | 4/1/2019 | | FAIL |
Julie Romig
|
|
|
Need DRH and CUP approvals from planning
|
Intake Approval | | | 2/26/2019 | | FAIL |
Julie Romig
|
|
|
Need Design Review approval.
|
Application received | | | 2/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 11 2019 10:29AM
|
Intake Approval | | | 2/11/2019 | | FAIL |
Julie Romig
|
|
|
To complete your application, please upload a completed 520 checklist with all applicable documents as required by checklist.
- Checklist can be found here: https://pds.cityofboise.org/media/103678/520-major-ti-submittal-checklist_7-6-16.pdf
- Drawings are required to be uploaded as individual sheet files, named per the City of Boise naming conventions (ie, G0.00 Cover Page). Drawing PDF has been deleted from the drawing folder to be re-uploaded.
- Note that exterior modifications require Design Review approval prior to submitting the building permit application. Please contact Katelyn Menuge at kmenuge@cityofboise.org or ###-#### regarding this application process.
|
BLD-Aging Inspection | 8/11/2020 | 8/11/2020 | | | |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 8/10/2020 | 8/10/2020 | | | |
Mike Jordan
|
|
|
|