Permit Information
Permit NumberBLD19-00425
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 1835 W COMMERCE AVE
Project NameTrimCo Millwork - Addition
Customer Number 
ePlanReviewYes
Description
(TRIMCO MILLWORK – BUILDING ADDITION – EAST SIDE) (DRH18-00271) The fire sprinkler system is used for unlimited area of the building. To construct a 6,750 square foot pre-engineered metal building addition on the East side of an existing 58,000 square foot building. After the addition, this building will have a total floor area of about 64,750 square feet. Minimum 60 foot wide yards or public ways are required to be maintained around this building on all sides and corners. Work is to include concrete footings, concrete pedestals, concrete stem walls, concrete slab on grade, steel beam and column moment frames, steel rod cross bracing, recessed concrete loading dock, guard rails at loading dock sides, dock levelers, metal wall purlins and metal siding, metal roof purlins and metal roof panels, two insulated 9’ wide by 10’ high overhead doors at the loading dock, a new overhead door opening in an existing concrete wall with a steel lintel above and a steel column on each side to support the lintel and to resist out-of-plane lateral loads, exterior man doors with exterior landings and ramps, exterior concrete slab on grade for a relocated trash compactor, an interior nonbearing wall with a 12’ wide by 12’ high overhead door and a man door, woodworking equipment with dust collection, a spray booth, and finishes. Special Inspection is required for concrete, steel (including welding and high strength bolting), and for post-installed anchors in hardened concrete. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. This permit is intended to establish a Certificate of Occupancy for the building addition only. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/1/201912/30/2019 DONE
This permit finaled on the web by Ronald Van Auker
Third Notice 11/3/201911/26/2019 DONE
mailed 12-2-19
Second Notice 9/30/201910/29/2019 DONE
mailed 11-1
First Notice8/19/20198/19/20199/20/2019 DONE
DetailsBrandon Shaw
mailed 9-23-19
BLD-Final8/16/20198/19/20198/19/2019APASS
DetailsBrandon Shaw
Corrections SAT
DOC - Permit Finaled8/19/20198/19/20198/19/2019PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval8/14/20198/14/20198/14/2019 DONE
DetailsTiffany Lowery
Engineer letter received 08/08/19. Project ok to sign off
BLD-Final8/8/20198/9/20198/9/2019APART
DetailsJim Storey
Jake Phone #: ###-#### need 2-exit signs// handrails at exterior stairs three risers.
FIRE-Final Inspection8/8/20198/9/20198/9/2019APASS
DetailsJim Page
Previously noted items have been corrected, sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags, paint booth fan shut down tested with fire alarm interface. Final life fire safety inspection for area of work complete.

Jake Phone #: ###-####
FIRE-Final Inspection8/7/20198/8/20198/8/2019AFAIL
DetailsJim Page
Need exhaust fan on paint booth to shut down when fire alarm activates. Repair emergency lighting that did not work on the exterior whip emergency light and fix the inop light on the interior middle door egress lighting.

JAKE- Phone #: ###-####
BLD-Energy code compliance6/26/20196/26/20196/26/2019PPASS
DetailsJim Storey
ron Phone #: ###-####
BLD-Framing/Rough-in6/21/20196/24/20196/24/2019APASS
DetailsJim Storey
Ron Phone #: ###-####
BLD-Foundation5/30/20195/30/20195/30/2019PPASS
DetailsJim Storey
rebar // Ron Phone #: ###-####
BLD-Foundation5/14/20195/15/20195/15/2019PPASS
DetailsJim Storey
Ron Phone #: ###-####
BLD-Foundation5/10/20195/13/20195/13/2019APASS
DetailsJim Storey
partial // Ron Phone #: ###-#### s/w wall ok
BLD-Footing5/7/20195/8/20195/8/2019PPASS
DetailsJim Storey
Ron Phone #: ###-####
Plan Reviewer's activity  5/6/2019 DONE
Uploaded revised Sheet A-1 showing an additional door to the outside.
Issue PAID IN FULL permit  4/25/2019 DONE
Inspection Record Card- Bld  4/25/2019 DONE
OVERRIDE  4/24/2019  
Permit Ready to Issue  4/24/2019 DONE
NEED ACHD (WAITING TO HEAR FROM MITCH BLH 4-24)

MET GJENSEN@VANAUKER.COM
NEED GC
NEED Rev Val
Routing - FIRE4/18/20194/18/20194/23/2019 PASS
DetailsMark Scharfen
IFC Review Complete. IFC review 04.23.2019.pdf uploaded. Passed.
Plan assigned to (CJW)2/20/20192/26/20194/23/2019 PASS
DetailsCarl Westfall
(1st done) 03/26/19 (new building - 25 days) (eplan - 38 sheets) Trimco Millwork Addition (routed to staff)
PLANS/APPL TAKEN TO FRONT DESK  4/23/2019 DONE
Routing - PLAN CHECK4/17/2019 4/18/2019 PASS
DetailsCarl Westfall
Routing PW Drainage4/18/2019 4/18/2019 PASS
DetailsBrian Murphy
Plan resubmittals requested  4/17/2019 DONE
Plan resubmittals received  4/17/2019 DONE
Routing PW Drainage4/9/2019 4/16/2019 FAIL
DetailsBrian Murphy
NEEDS SIW FORM GEOTECH AND APENDEX J
Routing Off Site - STRUCTURAL4/9/2019 4/16/2019 PASS
DetailsCarl Westfall
Dave Haugland (AHJ)
Routing - FIRE4/9/20194/9/20194/12/2019 FAIL
DetailsMark Scharfen
IFC 2nd review 04.12.2019.pdf uploaded and emailed to applicant.
Routing PW Sewer Rating4/9/2019 4/10/2019 PASS
DetailsMorgan Webb
A "high" and a "low" drinking fountain will be installed. There may have been a single drinking fountain at that location earlier.
Plan resubmittals received  4/9/2019 DONE
Routing - PLAN CHECK4/9/2019 4/9/2019 FAIL
DetailsCarl Westfall
Route to Impact Fee Review4/1/20194/4/20194/2/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Routing - FIRE2/26/20192/26/20194/1/2019 FAIL
DetailsMark Scharfen
IFC 1st review 04.01.2019.pdf uploaded and emailed to applicant.
1st review completed  4/1/2019 DONE
Plan resubmittals requested  4/1/2019 DONE
Routing - PLAN CHECK2/26/2019 3/22/2019 FAIL
DetailsCarl Westfall
Routing Off Site - STRUCTURAL2/26/2019 3/11/2019 FAIL
DetailsCarl Westfall
Dave Haugland (AHJ)
Routing PW Drainage2/26/2019 3/5/2019 FAIL
DetailsBrian Murphy
NEED SIW FORM GEO TECH 10 FEET FOUNATION, APDX J
Routing - PLUMBING2/26/2019 3/5/2019 PASS
DetailsDan Ediger
Per ISPC
Routing PW Environmental2/26/2019 3/5/2019 PASS
DetailsRick Christenson
Routing - Erosion and Sediment2/26/2019 3/4/2019 PASS
DetailsMichael Zawacki
Site prep inspection required.
Routing - MECHANICAL2/26/2019 2/28/2019 PASS
DetailsTroy James
Future dust collection system to be submitted at later date.
Routing PW Street Lights2/26/2019 2/27/2019 PASS
DetailsTom Marshall
Routing PW Solid Waste2/26/2019 2/27/2019 PASS
DetailsEvan Carpenter
Routing PW Sewer Design2/26/2019 2/26/2019 PASS
DetailsDeAnn Brown
Routing - Design Review2/26/2019 2/26/2019 PASS
DetailsKatelyn Menuge
DRH18-00271
Routing - PLANNING2/26/2019 2/26/2019 PASS
DetailsDavid Moser
See DRH18-00271
Routing - Addressing2/26/2019 2/26/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/26/2019 2/26/2019 PASS
DetailsMorgan Webb
Intake Approval  2/20/2019 PASS
DetailsJulie Romig
Prescreen approved per JAR
Intake Approval  2/13/2019 FAIL
DetailsJulie Romig
1. ESC Narrative (indicated on checklist but not found in small docs or on ESC plan)
2. Rotate all "Trimco PEMB" sheets to horizontal.
3. On all sheets, in the bottom right corner, leave a blank 4"x2" space located 3" off the right sheet edge for the city stamp.
Application received  2/11/2019 DONE
Application submitted via PDS Online on Feb 11 2019 4:34PM