BLD-Energy code compliance | 5/14/2020 | 5/15/2020 | 5/15/2020 | A | PART |
Jim Storey
|
|
|
*screened* Joe Phone #: ###-#### need pic of vappor barrior
|
BLD-Energy code compliance | 5/13/2020 | 5/14/2020 | 5/14/2020 | A | PART |
Jim Storey
|
|
|
*screened* Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Jim Storey
|
|
|
screened // Joe Phone #: ###-####
|
BLD-Foundation | 3/31/2020 | 4/1/2020 | 4/1/2020 | A | PASS |
Jim Storey
|
|
|
wall // joe Phone #: ###-####
|
BLD-Footing | 3/18/2020 | 3/19/2020 | 3/19/2020 | A | PASS |
Jim Storey
|
|
|
Joe Phone #: ###-####
|
BLD-Other | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Jim Storey
|
|
|
Roof nailing // Joe Phone #: ###-####
|
BLD-Foundation | 1/20/2020 | 1/21/2020 | 1/21/2020 | A | PASS |
Jim Storey
|
|
|
Retaining Wall Phone #: ###-#### Inspection requested via web by Scott Jones
|
BLD-Footing | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PASS |
Jim Storey
|
|
|
Joe Phone #: ###-#### interior footings and rebar pass
|
BLD-Footing | 9/18/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Jim Storey
|
|
|
Joe Phone #: ###-#### west side ft ok
|
BLD-Foundation | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | NR |
Jim Storey
|
|
|
Joe Phone #: ###-#### need aprovals boise city insp for ft// si compaction and rebar/slump air. engineer post anchors.
|
Meeting | | | 8/13/2019 | | DONE |
|
|
|
emailed tweitconst@gmail.com, letting them know we have everything from achd and someone may come in to pick up the plans and sign for the permits
|
Issue PAID IN FULL permit | | | 8/13/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/13/2019 | | DONE |
|
|
|
|
Place hold on job | 7/12/2019 | | 8/13/2019 | | DONE |
Brittany Hill
|
|
|
make sure foundation permit is issued BLD19-02577
|
Expiration Notice | 7/30/2019 | 8/20/2019 | 7/30/2019 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 7/8/2019 | | DONE |
|
|
|
emailed tweitconst@gmail.com that not all the fees were paid as well as that we still need the ACHD letter to know if fees are due for that and/or if an inspection is required
|
Plan resubmittals received | | | 6/27/2019 | | DONE |
Joe Bruce
|
|
|
Received A5-1, F1-0, A1-0, S0.0, S1.1, S1.2, S1.3, S1.4, S2.1, S3.1, and S3.2 from the architect as 22" x 34" sheets sizes.
|
Meeting | | | 6/27/2019 | | DONE |
|
|
|
Emailed applicant and GC to inform them we still need the 302, 306 and ACHD so we can input the fees before issuance.
|
OVERRIDE | | | 6/26/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 3/13/2019 | 3/13/2019 | 6/26/2019 | | PASS |
Joe Bruce
|
|
|
06/27 (4th Rev) 04/19 (502) Go To My Garage, ePlan (Bldg, Fire, PW Street Lights)
|
Plan Reviewer's activity | | | 6/26/2019 | | FAIL |
Joe Bruce
|
|
|
Several sheets are not the minimum sheet size and cannot be stamped approved by the permit technicians. Returned to architect to correct.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/26/2019 | | DONE |
|
|
|
MET
NEED
ACHD
please make sure the cert of val has the revision in it-may need to take out value of the early start permit
ESC permit ESC19-00141 is issued already
MET
GC FORM
REVISED VALUE
|
Routing Off Site - STRUCTURAL | 6/20/2019 | | 6/26/2019 | | PASS |
Joe Bruce
|
|
|
AHJ
|
Routing - FIRE | 6/20/2019 | 6/20/2019 | 6/25/2019 | | PASS |
Mark Scharfen
|
|
|
06/27-Go to my garage resubmittal MS-completed fire review. Uploaded rev_fire 06.26.2019.pdf. 1 hour on review (4th review)
|
Routing - PLAN CHECK | 6/20/2019 | | 6/25/2019 | | PASS |
Joe Bruce
|
|
|
|
Routing - Design Review | 6/20/2019 | | 6/21/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing PW Street Lights | 6/20/2019 | | 6/21/2019 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 6/20/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 5/31/2019 | 5/31/2019 | 6/10/2019 | | FAIL |
Mark Scharfen
|
|
|
06.10.2019-completed fire review. uploaded rev_fire 06.10.2019.pdf and emailed architect.
|
Plan resubmittals requested | | | 6/10/2019 | | DONE |
Joe Bruce
|
|
|
Failed 3rd Review. Additional information needed for Plan Check, PW Streetlights, and Fire reviews.
|
Routing - PLAN CHECK | 5/31/2019 | | 6/7/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 5/31/2019 | | 6/6/2019 | | PASS |
Joe Bruce
|
|
|
AHJ
|
Routing PW Street Lights | 5/31/2019 | | 6/3/2019 | | FAIL |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 5/31/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - Design Review | 5/31/2019 | | 5/31/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 5/22/2019 | | 5/22/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 5/22/2019 | | DONE |
Joe Bruce
|
|
|
emailed plan review report to architect.
|
Routing PW Drainage | 5/22/2019 | | 5/22/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Drainage | 5/14/2019 | | 5/22/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Solid Waste | 5/14/2019 | | 5/17/2019 | | PASS |
Peter J. McCullough
|
|
|
|
Routing Off Site - STRUCTURAL | 5/14/2019 | | 5/17/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing - FIRE | 5/15/2019 | 5/15/2019 | 5/15/2019 | | FAIL |
Mark Scharfen
|
|
|
IFC review completed 5/15. Uploaded rev_fire 05.15.2019.pdf and emailed architect.
|
Routing PW Street Lights | 5/15/2019 | | 5/15/2019 | | FAIL |
Tom Marshall
|
|
|
Street light plan would be nice.
|
Routing - Design Review | 5/14/2019 | | 5/14/2019 | | FAIL |
Katelyn Menuge
|
|
|
Need additional drainage swale information and pedestrian pathway 5 feet wide.
|
Plan resubmittals received | | | 5/7/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 5/7/2019 | | DONE |
Joe Bruce
|
|
|
1) Please revise the following sheets with the Alaska Architect stamp: ASL-1, LS-1, A3-3, A3-1, A2-1, A2-0, A1-0. These sheets all have the Alaska stamp. - The sheets do not show the Idaho registration number for your architecture license.
|
Plan resubmittals received | | | 5/2/2019 | | FAIL |
Joe Bruce
|
|
|
Sheet S3.4 was not uploaded into the drawings folder.
I have deleted sheet SK-S1.
Please revise the following sheets with the Alaska Architect stamp: ASL-1, LS-1, A3-3, A3-1, A2-1, A2-0, A1-0. These sheets all have the Alaska stamp.
The Architect License has expired as the May 1st and is no longer valid in the state of Idaho. Please have this license renewed or re-instated prior to resubmitting. Provide proof that this license has been reinstated. (See image below)
|
Plan resubmittals requested | | | 5/2/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 4/25/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 4/25/2019 | | DONE |
Joe Bruce
|
|
|
The resubmittal could not be processed due to the following items listed below. Please address each item and resubmit the required items.
1) Sheet SK-S1 does not meet our minimum requirements. Plan sheet does not have the required space reserved for City approval stamps as specified in the Electronic Plans Submittal Standards. Revise sheet with a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.
2) Sheet SK-S1 does not meet our minimum requirements. Minimum sheet size accepted is 18”x24”. Enlarge the sheet size as required.
3) The Alaska architect stamp provided on the resubmitted drawings cannot be accepted. Please provide the architect stamp for the state of Idaho.
|
Routing - FIRE | 3/13/2019 | 3/13/2019 | 4/18/2019 | | FAIL |
Mark Scharfen
|
|
|
Fire review uploaded and emailed to architecht.
|
Routing - PLAN CHECK | 3/13/2019 | | 4/18/2019 | | FAIL |
Joe Bruce
|
|
|
|
1st review completed | | | 4/18/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 4/18/2019 | | DONE |
Joe Bruce
|
|
|
Emailed architect plan review report.
|
Routing PW Sewer Design | 3/14/2019 | | 3/27/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing Off Site - STRUCTURAL | 3/13/2019 | | 3/26/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ
|
Routing PW Street Lights | 3/14/2019 | | 3/25/2019 | | FAIL |
Tom Marshall
|
|
|
Need a street light plan with(2) 30 foot davit poles with class B fixtures and a meter cabinet.
|
Routing PW Environmental | 3/14/2019 | | 3/25/2019 | | PASS |
Terry Alber
|
|
|
Plans show no drains in garage spaces. No Pretreatment required.
|
Routing PW Drainage | 3/14/2019 | | 3/22/2019 | | FAIL |
Brian Murphy
|
|
|
NEED BLD MOVED AND APDX J
|
Routing PW Solid Waste | 3/14/2019 | | 3/21/2019 | | FAIL |
Evan Carpenter
|
|
|
The solid waste enclosure must have at least 12 feet of unobstructed clearance between gate posts, (as measured from the innermost points, not the exterior dimensions), as well as a depth of at least 12 feet.
|
Routing - MECHANICAL | 3/13/2019 | | 3/18/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 3/13/2019 | | 3/15/2019 | | FAIL |
Katelyn Menuge
|
|
|
See changemarks
|
Routing - Addressing | 3/13/2019 | | 3/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 3/13/2019 | | 3/14/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 3/13/2019 | | 3/14/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Routing - PLANNING | 3/13/2019 | | 3/13/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLUMBING | 3/13/2019 | | 3/13/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Plan Reviewer's activity | | | 3/11/2019 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 3/11/2019 | | |
Carl D Madsen
|
|
|
|
Intake Approval | | | 3/1/2019 | | CANC |
|
|
|
(3-1-19) Refer to the circled items (i.e. the ones not having an OK in the circle) in the Plan Intake Checklist. Resolve each item as noted. CJW
|
Intake Approval | | | 2/21/2019 | | FAIL |
|
|
|
(2-21-19) Refer to the circled items in the Plan Intake Checklist. Resolve each item as noted. CJW
|
Application received | | | 2/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 11 2019 8:26PM
|