BLD-Final | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Jim Storey
|
|
|
MIKE Phone #: ###-#### sd ok
|
DOC - Permit Finaled | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | NR |
Jim Storey
|
|
|
Cindy Phone #: ###-#### need mech sign off// no framing insp.
|
(F) Reprint permit | | | 5/17/2019 | | DONE |
|
|
|
|
Meeting | | | 5/17/2019 | | DONE |
|
|
|
parcel owner Michael Peterson gave a letter to inform us that they will be taking the permit over as the Parcel owner and no longer working with the GC Renovation Perfection (see attached document)
|
Inspection Record Card- Bld | | | 5/15/2019 | | DONE |
|
|
|
|
BLD-Wall Bracing | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PASS |
Jim Storey
|
|
|
Aaron Phone #: ###-####
|
BLD-Footing | 3/26/2019 | 3/26/2019 | 3/26/2019 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/8/2019 | | DONE |
|
|
|
|
Meeting | | | 2/28/2019 | | DONE |
Jenny Nelson
|
|
|
Came in to talk about changing egress windows, changing 4x4 window to 4x5 for egress and 3x5 will change to 3x3.5. Said sizes are ok for bedroom egress. JJN
|
Routing Walk-In (BLD) | 2/25/2019 | 2/25/2019 | 2/25/2019 | A | DONE |
Josh Bogle
|
|
|
change window size
|
Routing - PLAN CHECK | 2/25/2019 | | 2/25/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/25/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/25/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2019 | | DONE |
Josh Bogle
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/25/2019 | | DONE |
|
|
|
per Josh
|
Routing Walk-In (BLD) | 2/13/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 2/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 2/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 2/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Issue PAID IN FULL permit | | | 2/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/13/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 2/12/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/12/2019 | 2/12/2019 | 2/12/2019 | A | FAIL |
Josh Bogle
|
|
|
lacked floor plans (before/after) & foundation plan
|
Routing - PLAN CHECK | 2/12/2019 | | 2/12/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 2/12/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/12/2019 | | | |
|
|
|
|