BLD-Aging Inspection | 2/21/2020 | 2/21/2020 | 2/21/2020 | | DEFR |
Brandon Shaw
|
|
|
|
DOC - Permit Expired | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | DONE |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 10/10/2019 | 10/10/2019 | 10/10/2019 | | DEFR |
Brandon Shaw
|
|
|
|
Extend Permit 90/180 days | 10/10/2019 | 10/10/2019 | 10/10/2019 | A | DONE |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 5/28/2019 | 5/28/2019 | 5/29/2019 | P | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
Routing - PLAN CHECK | 5/17/2019 | | 5/17/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/17/2019 | | DONE |
|
|
|
plan mod
|
CHANGE STATUS TO (ISS) | | | 5/17/2019 | | DONE |
|
|
|
no fee per josh
|
Inspection Record Card- Bld | | | 5/17/2019 | | |
|
|
|
|
BLD-Conference | 5/2/2019 | 5/2/2019 | 5/2/2019 | A | FAIL |
Brandon Shaw
|
|
|
Need a complete set of city approved plans on site... Need Engineering approval for lag bolts installed on knee brace's, plans show brackets... Need ELE rough-in...
|
BLD-Concrete | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Dave Hannah
|
|
|
rebar- Mark Phone #: ###-####
|
PubWorks Subgrade Approval | 3/8/2019 | 3/8/2019 | 3/8/2019 | | DONE |
Melissa Jannusch
|
|
|
PERGOLA .A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Foundation | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | FAIL |
Brandon Shaw
|
|
|
Need Geo sub-grade submitted and approved by PW...
|
Issue PAID IN FULL permit | | | 2/22/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 2/13/2019 | 2/13/2019 | 2/15/2019 | | PASS |
Josh Bogle
|
|
|
2/19 pergola, paper - Hillside
|
1st review completed | | | 2/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/15/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/15/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/15/2019 | | DONE |
|
|
|
spoke with shon informing him this permit is ready and the fee amount due
|
Routing - PLAN CHECK | 2/13/2019 | | 2/15/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - Erosion and Sediment | 2/13/2019 | | 2/14/2019 | | PASS |
Michael Zawacki
|
|
|
applicant is requesting that this project umbrella under the current permit, ESC19-00017
|
Routing Walk-In (Zoning) | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 2/13/2019 | 2/13/2019 | 2/13/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two
|
Routing PW Grading-Hillside | 2/13/2019 | | 2/13/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Application received | | 2/13/2019 | | | |
|
|
|
|