Second Notice | | 7/20/2019 | 7/17/2019 | | DONE |
|
|
|
|
Print Statement | | | 7/17/2019 | | DONE |
|
|
|
|
Meeting | | | 7/17/2019 | | DONE |
|
|
|
email & mail stament with fees due from the final value certificate that was received
|
First Notice | | 7/1/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
BLD-Final | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Jim Storey
|
|
|
Plumbing backflow cert passed and all other inspections complete. Looking for final sign-off for full Occupancy Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
Permanent Occupancy | | | 6/21/2019 | | DONE |
|
|
|
|
Temporary Occupancy | 6/14/2019 | 9/12/2019 | 6/14/2019 | | DONE |
Brittany Hill
|
|
|
|
PubWorks Occupancy Approval | 6/13/2019 | 6/13/2019 | 6/13/2019 | | DONE |
Mike Sheppard
|
|
|
|
BLD-Final | 6/12/2019 | 6/12/2019 | 6/12/2019 | A | PART |
Brandon Shaw
|
|
|
See PLM19-01175- need back flow cert...
|
FIRE-Final Inspection | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers will be placed in discussed locations and have current inspection tags. Final life fire safety inspection for area of work complete.
To coincide with Fire Alarm final for Johnson Controls/TYCO. Had a miscommunication in scheduling previously. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
FIRE-Final Inspection | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | FAIL |
Jim Page
|
|
|
Fire alarm contractor did not request an inspection, project associated FIR permits need to be finaled before life fire safety can be performed.
To coincide with Alarm test scheduled by Johnson Controls/TYCO. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
BLD-Ceiling Grid Inspection | 5/12/2019 | 5/13/2019 | 5/13/2019 | A | PEND |
Brandon Shaw
|
|
|
OK to cover, pending Mech rough-in...
|
Inspection Record Card- Bld | | | 5/10/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/10/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 4/11/2019 | | 4/16/2019 | | DONE |
Michael Hanson
|
|
|
04/17 plan mod
|
Routing - PLAN CHECK | 4/16/2019 | | 4/16/2019 | | PASS |
Michael Hanson
|
|
|
1 hour plan mod fee
|
Permit Ready to Issue | | | 4/16/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan Modification Accepted | | | 4/11/2019 | | DONE |
|
|
|
to reduce cost, the ceiling layout and lighting over the customer seating area was rvised for (3) suspended ceiling grid "clouds" with the rest of the space open to above. the location of the demising wall was updated per the landlord's built location. the metal wainscot has been revised to be 3'-6" all around the space with an updated details for the wainscot furring and wall mounted table brace attachment.
|
BLD-Framing/Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover...
|
BLD-Framing/Rough-in | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | NR |
Brandon Shaw
|
|
|
Plumbing/Electrical rough-in in AM Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
|
Print Occupancy Form | | | 3/25/2019 | | DONE |
|
|
|
|
Meeting | | | 3/22/2019 | | DONE |
|
|
|
kwood@bhillsarch.com..... sent email letting them know we recieved the email from ACHD and what the fee amount due
|
Issue PAID IN FULL permit | | | 3/22/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/22/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/21/2019 | 3/24/2019 | 3/21/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (M_H) | 2/21/2019 | | 3/21/2019 | | DONE |
|
|
|
03/20 #520 L3 ePlan. Plan check complete - Pending fire plan review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 3/21/2019 | | DONE |
|
|
|
MET
NEED ACHD
(kwood@bhillsarch.com)
all met
NEED GC
NEED rev cert of val
please make sure pwk impact fees are signed off in activity-met
|
Routing - FIRE | 2/21/2019 | 2/21/2019 | 3/20/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
1st review completed | | | 3/20/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 2/21/2019 | | 3/20/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing - MECHANICAL | 2/21/2019 | | 2/26/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Erosion and Sediment | 2/21/2019 | | 2/26/2019 | | PASS |
Michael Zawacki
|
|
|
TI, no esc required.
|
Routing PW Environmental | 2/22/2019 | | 2/26/2019 | | PASS |
Terry Alber
|
|
|
Grease waste line connected to existing Grease Interceptor.
|
Routing - PLANNING | 2/21/2019 | | 2/25/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 2/21/2019 | | 2/22/2019 | | PASS |
Doug Chausow
|
|
|
Ste 100
3/28, Client requested change to Suite 111, it has been updated.
|
Routing - PUBLIC WORKS | 2/21/2019 | | 2/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLUMBING | 2/21/2019 | | 2/21/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 2/21/2019 | | 2/21/2019 | | PASS |
Katelyn Menuge
|
|
|
Obtain City Clerk approval and all required alcohol licences/permits.
|
Intake Approval | | | 2/21/2019 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 2/20/2019 | | PASS |
|
|
|
Plan intake review approved
|
Application received | | | 2/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 18 2019 5:48PM
|