BLD-Final | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Ceiling Grid Inspection | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | CANC |
Mike Jordan
|
|
|
Tim Phone #: ###-####
|
BLD-Energy code compliance | 6/7/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Framing/Rough-in | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Mike Jordan
|
|
|
Tim- outside shear panel nailing inspection Phone #: ###-####
|
BLD-Foundation | 4/18/2019 | 4/18/2019 | 4/18/2019 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|
BLD-Foundation | 4/15/2019 | 4/16/2019 | 4/17/2019 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-#### ftg ok
|
Issue PAID IN FULL permit | | | 2/25/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/21/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 2/19/2019 | 2/19/2019 | 2/21/2019 | | PASS |
Josh Bogle
|
|
|
2/25 shop, paper
|
Routing - PLAN CHECK | 2/20/2019 | | 2/21/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 2/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 2/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 2/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 2/21/2019 | | DONE |
|
|
|
need
RP
|
Telephone call | | | 2/21/2019 | | DONE |
|
|
|
called Tim to let know permit is ready and how much is owed and that we need the RP-left message on his phone
|
Routing - PLANNING | 2/19/2019 | | 2/20/2019 | | PASS |
Sue Cummings
|
|
|
The "future covered patio" is not allowed. It increases the s.f. of the building and will not qualify for setback reduction.
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/19/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2019 | | DONE |
|
|
|
|
Application received | | 2/19/2019 | | | |
|
|
|
|