BLD-Final | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 12/13/2019 | 12/13/2019 | 12/13/2019 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 12/12/2019 | 12/12/2019 | 12/12/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
PubWorks Subgrade Approval | 12/11/2019 | 12/11/2019 | 12/11/2019 | | DONE |
Melissa Jannusch
|
|
|
POOL A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 8/6/2019 | 8/6/2019 | 8/6/2019 | P | PASS |
Brandon Shaw
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 7/31/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Brandon Shaw
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Wall Bracing | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Wall Bracing | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
Routing - MECHANICAL | 7/22/2019 | | 7/22/2019 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Foundation | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 4/9/2019 | 4/10/2019 | 4/10/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
Issue PAID IN FULL permit | | | 4/4/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 4/3/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 2/19/2019 | 2/19/2019 | 4/3/2019 | | DONE |
Jenny Nelson
|
|
|
03/08 sfd L2 Paper. 2nd review 3/19, clarify if pool part of permit, failed fire. 1st complete 3/8, fire review 3/11. Need pool engineering if part of permit, need foundation calcs, foundation dampproofing, shear wall calcs, wui soffit detail, 310 form for gazebo.
|
Inspection Record Card- Bld | | | 4/3/2019 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2019 | | DONE |
|
|
|
called Bryan to let know permit is ready and how much is owed-phone didn't work so emailed Bryan
|
Routing PW Grading-Hillside | 4/3/2019 | | 4/3/2019 | | PASS |
Melissa Jannusch
|
|
|
Plan Mod approved
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Case Summary (BLD) | | | 4/3/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 4/3/2019 | | DONE |
|
|
|
|
PubWorks Subgrade Approval | 3/29/2019 | 3/29/2019 | 3/29/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Plan resubmittals received | | | 3/28/2019 | | DONE |
Lee G Meredith
|
|
|
Resubmittals showing that driveway will hold a fire truck. Sheet C1
|
Routing - PUBLIC WORKS | 3/19/2019 | | 3/19/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - PLAN CHECK | 3/19/2019 | | 3/19/2019 | | PASS |
Jenny Nelson
|
|
|
|
Plan resubmittals received | | | 3/13/2019 | | DONE |
|
|
|
Resubmittals received 2 sets of sheets A1-A9-calcs & 310 form-took to Jenny
|
Routing - FIRE | 3/8/2019 | 3/8/2019 | 3/11/2019 | | PASS |
Lee G Meredith
|
|
|
03/13 New SFH Doug Lasher Construction
3-11-19: requires a sprinkler system due to length of driveway. Resubmittal required that indicates an NFPA 13D sprinkler system will be provided.
3-28-19: Site plan resubmittal increased driveway width to 20 feet and installed to support 75000 pounds. Modified driveway allows for proper access distance so no sprinklers required.
|
1st review completed | | | 3/11/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - Erosion and Sediment | 3/4/2019 | | 3/8/2019 | | PASS |
Andy J. Long
|
|
|
See ESC19-00178, issued with GRD19-00008. This ESC permit is VOID.
|
Routing - PLAN CHECK | | | 3/8/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Plan resubmittals received | | | 3/5/2019 | | DONE |
|
|
|
Three copies of ABCO Engineering Letter, Five copies of sheets C1. taken to Jenny
|
Routing - MECHANICAL | 3/1/2019 | | 3/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 2/27/2019 | | 3/1/2019 | | PASS |
Karla Nelson
|
|
|
Driveway and front setback retaining wall approved based on grading plan from 2-15-19 showing walls that do not exceed 3' in the front setback and a driveway width not exceeding 33' in the front setback.
|
Routing - PUBLIC WORKS | | | 2/27/2019 | | FAIL |
|
|
|
SEE HILLSIDE FOR FAIL
|
Routing PW Grading-Hillside | 2/20/2019 | | 2/26/2019 | | FAIL |
Melissa Jannusch
|
|
|
See e-mail to Jim Coslet dated 2-26-2019
|
Route to Impact Fee Review | 2/19/2019 | 2/22/2019 | 2/20/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 2/19/2019 | | 2/20/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 2/19/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2019 | | DONE |
|
|
|
|
Application received | | 2/19/2019 | | | |
|
|
|
|
Routing PW Grading-Hillside | 3/15/2019 | | | | PASS |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|