BLD-Final | 4/25/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Matt Tracy
|
DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 3/29/2019 | 4/1/2019 | 4/1/2019 | A | PASS |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Vapor barrier has been installed.
|
BLD-Framing/Rough-in | 3/28/2019 | 3/28/2019 | 3/28/2019 | P | PART |
Mike Jordan
|
|
|
Call ahead // Matt Phone #: ###-####. Needs to install the vapor barrier over exisiting concrete slab.
|
Routing Walk-In (BLD) | 3/8/2019 | 3/8/2019 | 3/8/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 3/8/2019 | | 3/8/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 3/8/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 3/8/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 3/8/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/8/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 3/7/2019 | 3/7/2019 | 3/7/2019 | A | FAIL |
Josh Bogle
|
|
|
engineering likley needed
|
Routing Walk-In (BLD) | 3/6/2019 | 3/6/2019 | 3/6/2019 | P | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 3/6/2019 | | 3/6/2019 | | FAIL |
Brian McGowan
|
|
|
More details required.
|
Routing Walk-In (BLD) | 2/19/2019 | 2/19/2019 | 2/19/2019 | P | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 2/19/2019 | | 2/19/2019 | | FAIL |
Josh Bogle
|
|
|
plans lacked details - needs a section view
|
1st review completed | | | 2/19/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 2/19/2019 | | | |
|
|
|
|